X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564241404002

Well Details

Well ID: 0564241404002
Loading map...
Location: 00/04-14-056-24W4/2
Location Alias: 00/04-14-56-24 W4M
Location Alias 2: 00/04-14-056-24 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 24
Section: 14
County/Municipality: Sturgeon County
Well Name: DORSET EXCELSIOR 4-14-56-24
Operator Name: Baytex Energy Ltd.
License Number: 0001679
License Date: 1950-06-29
License Status: Suspension
Spud Date: 1950-07-13
Final Drill Date: 1950-07-25
Well Total Depth: 1215.20 m
Surface Hole Latitude: 53.834600
Surface Hole Longitude: -113.468029

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-29 Obtained License
1950-07-01 Perforation Treatment Performed - Acid Wash - No Pressure
1950-07-01 Perforation Treatment Performed - Bullet Perforation
1950-07-25 Drill Stem Test Performed
1950-07-25 Finished Drilling
1950-07-25 Well Mode changed to Drilled and Cased
1950-07-27 Production Casing Operation Performed
1954-06-04 Perforation Treatment Performed - Visqueeze
1954-06-05 Perforation Treatment Performed - Bullet Perforation
1954-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-01-29 Perforation Treatment Performed - Acid Wash - No Pressure
1962-06-08 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1965-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-23 Plug Back Performed
1991-07-24 Perforation Treatment Performed - Jet Perforation
1991-09-28 Perforation Treatment Performed - Jet Perforation
1991-09-28 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
1991-09-28 Plug Back Performed
1991-09-29 Perforation Treatment Performed - Jet Perforation
1991-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-16 Plug Back Performed
1991-10-17 Perforation Treatment Performed - Jet Perforation
1991-10-19 Perforation Treatment Performed - Jet Perforation
1993-11-28 Well Began Production
1993-11-28 Well Fluid changed to Gas
1993-11-28 Well Mode changed to Flowing
2002-01-13 Perforation Treatment Performed - Jet Perforation
2002-01-13 Well Log Performed
2002-03-01 Well Fluid changed to Gas
2002-03-01 Well Mode changed to Suspended
2019-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-01-16 Plug Back Performed
2019-01-16 Well Fluid changed to Gas
2019-01-16 Well Mode changed to Abandoned Zone
2019-01-22 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-07-01 Bullet Perforation 1181.10 1190.20 7
1991-07-23 Packing Device Capped w/Cement 1160.00 1168.00 0
1991-07-24 Perforation 1139.30 1141.80 13
1991-09-28 Packing Dev Cpd w/Res-Gyp Cem 1133.20 1135.50 0
1991-09-28 Perforation 1127.30 1129.60 14
1991-09-29 Perforation 1125.20 1126.20 14
1991-09-29 Perforation 1123.20 1124.20 14
1991-09-29 Perforation 1120.20 1122.20 14
1991-09-29 Perforation 1117.30 1119.40 14
1991-10-07 Acid Treatment 1117.30 1129.60 0
1991-10-16 Packing Device Capped w/Cement 1099.00 1107.00 0
1950-07-01 Acid Wash 1181.10 1190.20 0
1991-10-17 Perforation 1050.70 1054.00 13
1991-10-19 Perforation 1057.20 1058.20 13
2002-01-13 Perforation 1065.50 1068.60 13
2019-01-16 Packing Device Capped w/Cement 1037.00 1045.00 0
1954-06-04 Visqueeze 1181.10 1190.20 0
1954-06-05 Bullet Perforation 1176.20 1179.30 13
1954-06-07 Acid Treatment 1176.20 1179.30 0
1954-07-13 Acid Treatment 1176.20 1179.30 0
1958-01-29 Acid Wash 1176.20 1179.30 0
1962-06-08 Resin-Gypsum Squeeze or Plug 1176.80 1179.30 0
1965-02-07 Acid Treatment 1176.20 1176.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 791 0.0 0.0 0.0
1994 8740 0.0 0.0 0.0
1995 8338 0.0 0.0 0.0
1996 7685 0.0 0.0 0.0
1997 8620 0.0 0.0 0.0
1998 8467 0.0 0.0 0.0
1999 8706 0.0 0.0 0.0
2000 8735 0.0 0.0 0.0
2001 8441 0.0 0.0 0.0
2002 504 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References