X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564212102000

Well Details

Well ID: 0564212102000
Loading map...
Location: 00/02-21-056-21W4/0
Location Alias: 00/02-21-56-21 W4M
Location Alias 2: 00/02-21-056-21 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 21
Section: 21
County/Municipality: Strathcona County
Well Name: IMPERIAL SIMMONS NO. 117
Operator Name: Imperial Oil Resources Limited
License Number: 0002641
License Date: 1951-02-21
License Status: RecCertified
Spud Date: 1951-02-25
Final Drill Date: 1951-03-08
Well Total Depth: 997.60 m
Surface Hole Latitude: 53.848985
Surface Hole Longitude: -113.059306

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-02-21 Obtained License
1951-03-06 Production Casing Operation Performed
1951-03-08 Finished Drilling
1951-03-08 Perforation Treatment Performed - Open-Hole Completion
1951-03-08 Well Mode changed to Drilled and Cased
1951-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-06-13 Well Began Production
1951-06-13 Well Fluid changed to Crude Oil
1951-06-13 Well Mode changed to Pumping
1960-06-10 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-01 Well Fluid changed to Crude Oil
1978-01-01 Well Mode changed to Suspended
1992-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-29 Perforation Treatment Performed - Jet Perforation
1992-09-29 Plug Back Performed
1992-10-04 Perforation Treatment Performed - Remedial Casing
1992-10-04 Well Fluid changed to Crude Oil
1992-10-04 Well Mode changed to Abandoned
1992-10-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-03-08 Open Hole/Barefoot Completion 983.30 997.60 0
1951-03-09 Acid Treatment 983.30 997.60 0
1960-06-10 Hydra Jet Perforation 991.50 992.10 0
1960-06-10 Hydra Jet Perforation 987.20 989.70 0
1961-06-03 Acid Treatment 983.30 995.50 0
1964-07-16 Acid Treatment 983.30 997.00 0
1992-09-29 Packing Device Capped w/Cement 933.30 941.30 0
1992-09-29 Perforation 189.70 190.70 7
1992-10-04 Remedial Casing Cementing 189.70 190.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7959 0.0 0.0 0.0
1968 4312 0.0 0.0 0.0
1982 127 0.0 0.0 0.0

For data sources see[5]

References