X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564200716030

Well Details

Well ID: 0564200716030
Loading map...
Location: 03/16-07-056-20W4/0
Location Alias: 03/16-07-56-20 W4M
Location Alias 2: 03/16-07-056-20 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 20
Section: 07
County/Municipality: Strathcona County
Well Name: WESTFIRE HZ 103 REDWATER 16-7-56-20
Operator Name: Long Run Exploration Ltd.
License Number: 0447757
License Date: 2012-08-14
License Status: Suspension
Spud Date: 2012-10-09
Final Drill Date: 2012-10-12
Well Total Depth: 1598.00 m
Surface Hole Latitude: 53.822874
Surface Hole Longitude: -112.959734

For data sources see[1][2]

Well History

Date Event
2012-08-14 Obtained License
2012-10-09 Well Log Performed
2012-10-10 Direction Drilling Operation Performed - Horizontal
2012-10-10 Surface Casing Operation Performed
2012-10-12 Finished Drilling
2012-10-12 Well Log Performed
2012-10-12 Well Mode changed to Drilled and Cased
2012-10-13 Production Casing Operation Performed
2012-10-13 Rig Released
2012-10-23 Well Log Performed
2012-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-12 Well Began Production
2012-11-12 Well Fluid changed to Crude Oil
2012-11-12 Well Mode changed to Pumping
2015-02-01 Well Fluid changed to Crude Oil
2015-02-01 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-09 Trinidad Drilling Ltd. 66 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-10 343.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-01 Multi-Stage Fracture 1583.10 1583.20 0
2012-11-01 Multi-Stage Fracture 1278.50 1278.60 0
2012-11-01 Multi-Stage Fracture 1243.90 1244.00 0
2012-11-01 Multi-Stage Fracture 1209.30 1209.40 0
2012-11-01 Multi-Stage Fracture 1174.40 1174.50 0
2012-11-01 Multi-Stage Fracture 1140.20 1140.30 0
2012-11-01 Multi-Stage Fracture 1105.50 1105.60 0
2012-11-01 Multi-Stage Fracture 1070.90 1071.00 0
2012-11-01 Multi-Stage Fracture 1036.20 1036.30 0
2012-11-01 Multi-Stage Fracture 1001.30 1001.40 0
2012-11-01 Multi-Stage Fracture 966.30 966.40 0
2012-11-01 Multi-Stage Fracture 1548.50 1548.60 0
2012-11-01 Multi-Stage Fracture 919.90 920.00 0
2012-11-01 Multi-Stage Fracture 873.40 873.50 0
2012-11-01 Multi-Stage Fracture 1522.60 1522.70 0
2012-11-01 Multi-Stage Fracture 1487.70 1487.80 0
2012-11-01 Multi-Stage Fracture 1452.90 1453.00 0
2012-11-01 Multi-Stage Fracture 1417.60 1417.70 0
2012-11-01 Multi-Stage Fracture 1382.60 1382.70 0
2012-11-01 Multi-Stage Fracture 1347.90 1348.00 0
2012-11-01 Multi-Stage Fracture 1313.20 1313.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 238 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-13 No Incident Encountered 0.00 0.00
2012-11-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References