X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564150306003

Well Details

Well ID: 0564150306003
Loading map...
Location: 00/06-03-056-15W4/3
Location Alias: 00/06-03-56-15 W4M
Location Alias 2: 00/06-03-056-15 W4/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 15
Section: 03
County/Municipality: County of Two Hills No. 21
Well Name: PEOC WILDON 6-3-56-15
Operator Name: Sequoia Resources Corp.
License Number: 0026816
License Date: 1964-09-17
License Status: Suspension
Spud Date: 1964-09-25
Final Drill Date: 1964-10-08
Well Total Depth: 658.70 m
Surface Hole Latitude: 53.807231
Surface Hole Longitude: -112.150287

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-09-17 Obtained License
1964-10-01 Drill Stem Test Performed
1964-10-02 Drill Stem Test Performed
1964-10-03 Drill Stem Test Performed
1964-10-04 Drill Stem Test Performed
1964-10-06 Production Casing Operation Performed
1964-10-08 Finished Drilling
1964-10-08 Well Mode changed to Drilled and Cased
1964-10-14 Perforation Treatment Performed - Open-Hole Completion
1966-07-11 Perforation Treatment Performed - Cement Plug
1966-07-13 Perforation Treatment Performed - Bullet Perforation
1967-06-07 Perforation Treatment Performed - Cement Plug
1967-06-08 Perforation Treatment Performed - Jet Perforation
1967-06-08 Well Began Production
1967-06-08 Well Fluid changed to Gas
1967-06-08 Well Mode changed to Flowing
1968-10-04 Perforation Treatment Performed - Jet Perforation
1968-10-05 Well Fluid changed to Gas
1968-10-05 Well Mode changed to Flowing
1982-04-28 Well Fluid changed to Gas
1982-04-28 Well Mode changed to Suspended
1982-08-27 Well Fluid changed to Gas
1982-08-27 Well Mode changed to Flowing
1992-04-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-04-06 Perforation Treatment Performed - Jet Perforation
1992-04-06 Plug Back Performed
1992-04-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-04-07 Perforation Treatment Performed - Jet Perforation
1992-04-08 Perforation Treatment Performed - Remedial Casing
1993-04-03 Well Log Performed
1993-04-06 Well Fluid changed to Gas
1993-04-06 Well Log Performed
1993-04-06 Well Mode changed to Abandoned Zone
1993-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-15 Perforation Treatment Performed - Jet Perforation
1993-10-15 Perforation Treatment Performed - Remedial Casing
1995-09-12 Perforation Treatment Performed - Jet Perforation
1995-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-22 Perforation Treatment Performed - Remedial Casing
1997-09-30 Perforation Treatment Performed - Jet Perforation
1997-11-04 Well Fluid changed to Gas
1997-11-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-10-14 Open Hole/Barefoot Completion 623.30 658.70 0
1992-04-07 Packing Device Capped w/Cement 338.00 346.00 0
1992-04-07 Perforation 189.00 189.50 13
1992-04-08 Remedial Casing Cementing 189.00 189.50 0
1993-10-15 Perforation 350.00 350.50 13
1993-10-15 Perforation 493.80 495.90 10
1993-10-15 Acid Treatment 493.80 495.90 0
1993-10-15 Remedial Casing Cementing 493.80 495.90 0
1993-10-15 Remedial Casing Cementing 350.00 350.50 0
1995-09-12 Perforation 189.00 189.50 13
1995-11-08 Acid Treatment 189.00 189.50 0
1966-07-11 Cement Plug 612.60 658.70 0
1997-09-22 Acid Treatment 189.00 189.50 0
1997-09-22 Remedial Casing Cementing 189.00 189.50 0
1997-09-30 Perforation 533.00 535.80 13
1997-09-30 Perforation 493.50 494.50 13
1966-07-13 Bullet Perforation 568.80 570.60 7
1967-06-07 Cement Plug 554.40 585.20 0
1967-06-08 Perforation 538.30 540.10 7
1968-10-04 Perforation 493.80 495.90 10
1992-04-06 Packing Device Capped w/Cement 519.00 527.00 0
1992-04-06 Packing Device Capped w/Cement 480.00 488.00 0
1992-04-06 Perforation 350.00 350.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 8391 0.0 0.0 0.0
1970 8457 0.0 0.0 0.0
1971 8370 0.0 0.0 0.0
1972 8453 0.0 0.0 0.0
1973 7861 0.0 0.0 0.0
1974 4791 0.0 0.0 0.0
1975 631 0.0 0.0 0.0
1976 230 0.0 0.0 0.0
1977 5639 0.0 0.0 0.0
1978 3097 0.0 0.0 0.0
1979 658 0.0 0.0 0.0
1980 1519 0.0 0.0 0.0
1982 1754 0.0 0.0 0.0
1983 240 0.0 0.0 0.0
1984 708 0.0 0.0 0.0
1985 3402 0.0 0.0 0.0
1986 1752 0.0 0.0 0.0
1987 2144 0.0 0.0 0.0
1988 610 0.0 0.0 0.0
1997 1366 0.0 0.0 0.0
1998 8756 0.0 0.0 0.0
1999 8751 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8733 0.0 0.0 0.0
2002 8717 0.0 0.0 0.0
2003 8752 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8730 0.0 0.0 0.0
2006 8726 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8679 0.0 0.0 0.0
2010 8691 0.0 0.0 0.0
2011 8726 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8754 0.0 0.0 0.0
2018 1945 0.0 0.0 0.0

For data sources see[5]

References