If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0564120503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.805509,"lon":-111.755796,"icon":""}]} |
Location: 00/03-05-056-12W4/0 | |
Location Alias: 00/03-05-56-12 W4M | |
Location Alias 2: 00/03-05-056-12 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 4 | |
Range: 12 | |
Section: 05 | |
County/Municipality: County of Two Hills No. 21 | |
Well Name: PEOC DUV 3-5-56-12 | |
Operator Name: Sequoia Resources Corp. | |
License Number: 0091780 | |
License Date: 1981-08-20 | |
License Status: Abandoned | |
Spud Date: 1981-08-24 | |
Final Drill Date: 1981-08-28 | |
Well Total Depth: 655.00 m | |
Surface Hole Latitude: 53.805509 | |
Surface Hole Longitude: -111.755796 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-08-20 | Obtained License |
1981-08-27 | Drill Stem Test Performed |
1981-08-28 | Finished Drilling |
1981-08-29 | Drill Stem Test Performed |
1981-08-29 | Well Log Performed |
1981-08-30 | Production Casing Operation Performed |
1981-08-30 | Well Mode changed to Drilled and Cased |
1981-09-04 | Perforation Treatment Performed - Jet Perforation |
1981-09-08 | Perforation Treatment Performed - Jet Perforation |
1981-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-09-10 | Perforation Treatment Performed - Cement Squeeze |
1981-09-14 | Perforation Treatment Performed - Jet Perforation |
1981-09-14 | Well Mode changed to Drilled and Cased |
1982-12-01 | Well Began Production |
1982-12-01 | Well Fluid changed to Gas |
1982-12-01 | Well Mode changed to Flowing |
1988-10-01 | Well Fluid changed to Gas |
1988-10-01 | Well Mode changed to Suspended |
1992-06-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-06-02 | Perforation Treatment Performed - Jet Perforation |
1992-06-02 | Plug Back Performed |
1992-06-02 | Well Fluid changed to Gas |
1992-06-02 | Well Mode changed to Abandoned Zone |
1992-06-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-06-03 | Perforation Treatment Performed - Jet Perforation |
1992-06-03 | Perforation Treatment Performed - Remedial Casing |
1992-06-03 | Well Abandoned |
1993-06-03 | Well Log Performed |
1993-10-07 | Perforation Treatment Performed - Jet Perforation |
1993-10-08 | Perforation Treatment Performed - Jet Perforation |
1993-10-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-08-04 | Well Log Performed |
1995-08-14 | Perforation Treatment Performed - Jet Perforation |
1995-08-15 | Perforation Treatment Performed - Remedial Casing |
1996-06-17 | Perforation Treatment Performed - Jet Perforation |
1996-06-17 | Perforation Treatment Performed - Remedial Casing |
1997-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-10-14 | Perforation Treatment Performed - Jet Perforation |
1997-10-14 | Plug Back Performed |
1997-10-15 | Perforation Treatment Performed - Remedial Casing |
1999-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-09-30 | Perforation Treatment Performed - Jet Perforation |
1999-09-30 | Perforation Treatment Performed - Remedial Casing |
1999-09-30 | Plug Back Performed |
2000-06-24 | Perforation Treatment Performed - Cement Plug |
2000-06-24 | Perforation Treatment Performed - Remedial Casing |
2000-06-26 | Perforation Treatment Performed - Jet Perforation |
2000-06-26 | Perforation Treatment Performed - Remedial Casing |
2001-05-04 | Perforation Treatment Performed - Jet Perforation |
2001-05-04 | Perforation Treatment Performed - Remedial Casing |
2002-06-10 | Perforation Treatment Performed - Jet Perforation |
2002-06-12 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-09-04 | Perforation | 468.00 | 469.50 | 13 |
1992-06-03 | Perforation | 333.00 | 334.00 | 13 |
1992-06-03 | Remedial Casing Cementing | 333.00 | 334.00 | 0 |
1993-10-07 | Perforation | 401.00 | 401.50 | 13 |
1993-10-08 | Perforation | 430.00 | 432.00 | 13 |
1993-10-12 | Acid Treatment | 434.00 | 435.00 | 0 |
1995-08-14 | Perforation | 345.00 | 346.00 | 13 |
1995-08-15 | Remedial Casing Cementing | 345.00 | 346.00 | 0 |
1996-06-17 | Perforation | 184.00 | 185.00 | 13 |
1996-06-17 | Remedial Casing Cementing | 184.00 | 185.00 | 0 |
1997-10-14 | Perforation | 468.00 | 469.50 | 13 |
1981-09-08 | Perforation | 434.00 | 435.00 | 13 |
1997-10-14 | Packing Device Capped w/Cement | 442.40 | 457.40 | 0 |
1997-10-15 | Remedial Casing Cementing | 401.00 | 401.50 | 0 |
1999-09-30 | Packing Device Capped w/Cement | 417.00 | 425.00 | 0 |
1999-09-30 | Perforation | 358.00 | 359.00 | 13 |
1999-09-30 | Remedial Casing Cementing | 358.00 | 359.00 | 0 |
2000-06-24 | Remedial Casing Cementing | 345.00 | 346.00 | 0 |
2000-06-24 | Cement Plug | 318.00 | 341.00 | 0 |
2000-06-26 | Perforation | 287.00 | 288.00 | 13 |
2000-06-26 | Remedial Casing Cementing | 287.00 | 288.00 | 0 |
2000-06-26 | Remedial Casing Cementing | 184.00 | 185.00 | 0 |
1981-09-09 | Acid Treatment | 434.00 | 435.00 | 0 |
2001-05-04 | Perforation | 210.00 | 211.00 | 12 |
2001-05-04 | Remedial Casing Cementing | 210.00 | 211.00 | 0 |
2002-06-10 | Perforation | 181.50 | 184.50 | 20 |
2002-06-12 | Remedial Casing Cementing | 181.50 | 184.50 | 0 |
1981-09-10 | Cement Squeeze | 434.00 | 435.00 | 0 |
1981-09-14 | Perforation | 430.00 | 432.00 | 13 |
1992-06-02 | Packing Device Capped w/Cement | 450.00 | 458.00 | 0 |
1992-06-02 | Packing Device Capped w/Cement | 412.50 | 420.50 | 0 |
1992-06-02 | Perforation | 401.00 | 401.50 | 13 |
1992-06-03 | Packing Device Capped w/Cement | 382.00 | 390.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 498 | 0.0 | 0.0 | 0.0 |
1983 | 6496 | 0.0 | 0.0 | 0.0 |
1984 | 6118 | 0.0 | 0.0 | 0.0 |
1985 | 6171 | 0.0 | 0.0 | 0.0 |
1986 | 6142 | 0.0 | 0.0 | 0.0 |
1987 | 3623 | 0.0 | 0.0 | 0.0 |
For data sources see[5]