X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564062008022

Well Details

Well ID: 0564062008022
Loading map...
Location: 02/08-20-056-06W4/2
Location Alias: 02/08-20-56-06 W4M
Location Alias 2: 02/08-20-056-06 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 06
Section: 20
County/Municipality: County of St. Paul No. 19
Well Name: CNRL 8D LNDBRGH 8-20-56-6
Operator Name: Canadian Natural Resources Limited
License Number: 0460502
License Date: 2013-10-25
License Status: Issued
Spud Date: 2014-02-11
Final Drill Date: 2014-02-15
Well Total Depth: 1093.00 m
Surface Hole Latitude: 53.860014
Surface Hole Longitude: -110.851052

For data sources see[1][2]

Well History

Date Event
2013-10-25 Obtained License
2014-02-11 Direction Drilling Operation Performed - Deviate
2014-02-12 Surface Casing Operation Performed
2014-02-15 Finished Drilling
2014-02-15 Well Log Performed
2014-02-15 Well Mode changed to Drilled and Cased
2014-02-16 Production Casing Operation Performed
2014-02-16 Rig Released
2014-02-27 Perforation Treatment Performed - Jet Perforation
2014-08-21 Perforation Treatment Performed - Jet Perforation
2014-08-21 Well Log Performed
2014-11-19 Perforation Treatment Performed - Jet Perforation
2014-11-19 Well Log Performed
2015-03-03 Perforation Treatment Performed - Cement Plug
2015-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-03-04 Plug Back Performed
2015-03-05 Perforation Treatment Performed - Jet Perforation
2015-03-05 Well Log Performed
2015-03-07 Well Began Production
2015-03-07 Well Fluid changed to Crude Bitumen
2015-03-07 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-02-11 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-02-27 Perforation 1017.50 1021.00 26
2014-02-27 Perforation 1024.50 1026.00 26
2014-08-21 Perforation 1007.00 1009.50 26
2014-11-19 Perforation 992.00 997.50 26
2015-03-03 Cement Plug 1024.00 1068.90 0
2015-03-04 Packing Device Capped w/Cement 968.00 983.00 0
2015-03-05 Perforation 736.00 737.00 26
2015-03-05 Perforation 741.50 747.00 26
2015-03-05 Perforation 751.50 754.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7037 0.0 0.0 0.0
2016 8386 0.0 0.0 0.0
2017 8305 0.0 0.0 0.0
2018 8133 0.0 0.0 0.0
2019 8047 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-16 No Incident Encountered 0.00 0.00
2014-03-03 No Incident Encountered 0.00 0.00
2014-08-21 No Incident Encountered 0.00 0.00
2014-11-20 No Incident Encountered 0.00 0.00
2015-03-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References