X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564061512000

Well Details

Well ID: 0564061512000
Loading map...
Location: 00/12-15-056-06W4/0
Location Alias: 00/12-15-56-06 W4M
Location Alias 2: 00/12-15-056-06 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 06
Section: 15
County/Municipality: County of St. Paul No. 19
Well Name: NORWEST LINDBERGH 12A-15-56-6
Operator Name: Canadian Natural Resources Limited
License Number: 0096190
License Date: 1982-08-04
License Status: Suspension
Spud Date: 1982-06-14
Final Drill Date: 1982-06-17
Well Total Depth: 619.00 m
Surface Hole Latitude: 53.839497
Surface Hole Longitude: -110.817231

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-06-17 Finished Drilling
1982-06-17 Well Log Performed
1982-06-18 Production Casing Operation Performed
1982-06-18 Well Mode changed to Drilled and Cased
1982-07-30 Perforation Treatment Performed - Jet Perforation
1982-08-01 Well Began Production
1982-08-01 Well Fluid changed to Crude Bitumen
1982-08-01 Well Mode changed to Pumping
1982-08-04 Obtained License
1986-08-01 Well Fluid changed to Crude Bitumen
1986-08-01 Well Mode changed to Suspended
1987-10-01 Well Fluid changed to Crude Bitumen
1987-10-01 Well Mode changed to Pumping
1995-12-31 Well Fluid changed to Crude Bitumen
1995-12-31 Well Mode changed to Suspended
1996-08-28 Perforation Treatment Performed - Jet Perforation
1996-08-28 Well Fluid changed to Crude Bitumen
1996-08-28 Well Mode changed to Pumping
1999-09-29 Well Fluid changed to Crude Bitumen
1999-09-29 Well Mode changed to Suspended
2000-07-21 Well Fluid changed to Crude Bitumen
2000-07-21 Well Mode changed to Pumping
2002-01-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-03 Perforation Treatment Performed - Jet Perforation
2002-01-03 Plug Back Performed
2002-01-03 Well Fluid changed to Crude Bitumen
2002-01-03 Well Log Performed
2002-01-03 Well Mode changed to Abandoned Zone
2012-04-15 Perforation Treatment Performed - Cement Plug
2012-04-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-04-16 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-07-30 Perforation 591.00 597.00 13
1996-08-28 Perforation 610.50 612.50 26
1996-08-28 Perforation 593.00 597.00 26
2002-01-02 Packing Device Capped w/Cement 596.00 605.00 0
2002-01-03 Packing Device Capped w/Cement 574.00 583.00 0
2002-01-03 Perforation 473.00 474.00 26
2002-01-03 Perforation 469.50 470.50 26
2012-04-15 Cement Plug 478.00 574.00 0
2012-04-16 Packing Device Capped w/Cement 446.80 465.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 3415 0.0 0.0 0.0
1983 8203 0.0 0.0 0.0
1984 4745 0.0 0.0 0.0
1987 2194 0.0 0.0 0.0
1988 8250 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8560 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8747 0.0 0.0 0.0
1994 7402 0.0 0.0 0.0
1995 20 0.0 0.0 0.0
1996 2490 0.0 0.0 0.0
1997 8721 0.0 0.0 0.0
1998 6781 0.0 0.0 0.0
2000 3143 0.0 0.0 0.0
2001 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References