X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564041206002

Well Details

Well ID: 0564041206002
Loading map...
Location: 00/06-12-056-04W4/2
Location Alias: 00/06-12-56-04 W4M
Location Alias 2: 00/06-12-056-04 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 04
Section: 12
County/Municipality: County of St. Paul No. 19
Well Name: WLEC LIND 6-12-56-4
Operator Name: West Lake Energy Corp.
License Number: 0171509
License Date: 1994-10-17
License Status: Issued
Spud Date: 1994-10-30
Final Drill Date: 1994-11-01
Well Total Depth: 535.00 m
Surface Hole Latitude: 53.822237
Surface Hole Longitude: -110.466075

For data sources see[1][2]

Well History

Date Event
1994-10-17 Obtained License
1994-10-31 Surface Casing Operation Performed
1994-11-01 Finished Drilling
1994-11-01 Well Log Performed
1994-11-01 Well Mode changed to Drilled and Cased
1994-11-02 Production Casing Operation Performed
1994-11-02 Rig Released
1994-11-09 Perforation Treatment Performed - Jet Perforation
1994-11-10 Well Log Performed
1994-11-11 Perforation Treatment Performed - Jet Perforation
1994-11-12 Well Log Performed
1995-03-31 Well Began Production
1995-03-31 Well Fluid changed to Gas
1995-03-31 Well Mode changed to Flowing
1997-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-13 Perforation Treatment Performed - Jet Perforation
1997-03-13 Plug Back Performed
1997-03-13 Well Fluid changed to Gas
1997-03-13 Well Log Performed
1997-03-13 Well Mode changed to Suspended
1997-03-31 Well Fluid changed to Gas
1997-03-31 Well Mode changed to Abandoned Zone
2003-12-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-09 Perforation 406.00 407.00 14
1994-11-11 Perforation 393.00 395.50 14
1997-03-13 Packing Device Capped w/Cement 375.00 387.00 0
1997-03-13 Perforation 351.00 352.50 26
2003-12-18 Fracture 351.00 352.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 5303 0.0 0.0 0.0
1996 7420 0.0 0.0 0.0
1997 957 0.0 0.0 0.0

For data sources see[5]

References