X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564030705000

Well Details

Well ID: 0564030705000
Loading map...
Location: 00/05-07-056-03W4/0
Location Alias: 00/05-07-56-03 W4M
Location Alias 2: 00/05-07-056-03 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 03
Section: 07
County/Municipality: County of St. Paul No. 19
Well Name: PVR 5B FROG LAKE 5-7-56-3
Operator Name: Canadian Natural Resources Limited
License Number: 0188983
License Date: 1996-06-24
License Status: Abandoned
Spud Date: 1996-07-02
Final Drill Date: 1996-07-03
Well Total Depth: 690.00 m
Surface Hole Latitude: 53.823675
Surface Hole Longitude: -110.444507

For data sources see[1][2]

Well History

Date Event
1996-06-24 Obtained License
1996-07-02 Direction Drilling Operation Performed - Deviate
1996-07-02 Surface Casing Operation Performed
1996-07-03 Finished Drilling
1996-07-03 Well Mode changed to Drilled and Cased
1996-07-04 Production Casing Operation Performed
1996-07-04 Well Log Performed
1996-07-05 Rig Released
1996-07-19 Well Log Performed
1996-08-11 Well Log Performed
1996-08-14 Perforation Treatment Performed - Jet Perforation
1996-08-14 Well Log Performed
1996-08-21 Well Began Production
1996-08-21 Well Fluid changed to Crude Bitumen
1996-08-21 Well Mode changed to Pumping
1997-03-12 Well Log Performed
1997-04-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-04-21 Perforation Treatment Performed - Jet Perforation
1997-04-21 Well Log Performed
1997-04-26 Perforation Treatment Performed - Jet Perforation
1997-04-26 Well Log Performed
2002-02-14 Perforation Treatment Performed - Jet Perforation
2004-03-31 Well Fluid changed to Crude Bitumen
2004-03-31 Well Mode changed to Suspended
2004-10-08 Well Fluid changed to Crude Bitumen
2004-10-08 Well Mode changed to Pumping
2007-04-30 Well Fluid changed to Crude Bitumen
2007-04-30 Well Mode changed to Suspended
2008-03-19 Perforation Treatment Performed - Jet Perforation
2008-03-19 Well Log Performed
2008-03-23 Well Fluid changed to Crude Bitumen
2008-03-23 Well Mode changed to Pumping
2009-09-30 Well Fluid changed to Crude Bitumen
2009-09-30 Well Mode changed to Suspended
2011-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-21 Perforation Treatment Performed - Cement Plug
2011-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-22 Plug Back Performed
2011-11-22 Well Fluid changed to Crude Bitumen
2011-11-22 Well Mode changed to Abandoned Zone
2011-11-30 Well Abandoned
2011-11-30 Well Fluid changed to Crude Bitumen
2011-11-30 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-07-02 112.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-14 Perforation 645.00 652.00 30
2011-11-21 Cement Plug 606.00 628.00 0
2011-11-21 Packing Device Capped w/Cement 589.00 597.00 0
2011-11-22 Packing Device Capped w/Cement 500.00 580.00 0
1996-08-14 Perforation 654.00 657.00 30
1997-04-18 Packing Device Capped w/Cement 627.50 643.00 0
1997-04-21 Perforation 598.00 603.00 17
1997-04-26 Perforation 598.00 603.00 20
2002-02-14 Perforation 603.00 606.00 17
2008-03-19 Perforation 585.50 587.50 20
2008-03-19 Perforation 592.00 592.80 20
2008-03-19 Perforation 593.40 595.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2759 0.0 0.0 0.0
1997 6926 0.0 0.0 0.0
1998 8518 0.0 0.0 0.0
1999 4615 0.0 0.0 0.0
2001 5767 0.0 0.0 0.0
2002 3319 0.0 0.0 0.0
2004 1802 0.0 0.0 0.0
2005 6711 0.0 0.0 0.0
2006 2410 0.0 0.0 0.0
2008 6533 0.0 0.0 0.0
2009 724 0.0 0.0 0.0

For data sources see[6]

References