X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564030513030

Well Details

Well ID: 0564030513030
Loading map...
Location: 03/13-05-056-03W4/0
Location Alias: 03/13-05-56-03 W4M
Location Alias 2: 03/13-05-056-03 W4/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 03
Section: 05
County/Municipality: County of St. Paul No. 19
Well Name: PVR 13A FROG LAKE 13-5-56-3
Operator Name: Canadian Natural Resources Limited
License Number: 0198804
License Date: 1997-02-28
License Status: Abandoned
Spud Date: 1997-03-06
Final Drill Date: 1997-03-08
Well Total Depth: 508.00 m
Surface Hole Latitude: 53.814121
Surface Hole Longitude: -110.418993

For data sources see[1][2]

Well History

Date Event
1997-02-28 Obtained License
1997-03-06 Direction Drilling Operation Performed - Deviate
1997-03-07 Surface Casing Operation Performed
1997-03-08 Finished Drilling
1997-03-08 Production Casing Operation Performed
1997-03-08 Rig Released
1997-03-08 Well Log Performed
1997-03-08 Well Mode changed to Drilled and Cased
1997-03-18 Well Log Performed
1997-04-03 Perforation Treatment Performed - Jet Perforation
1997-04-04 Well Log Performed
1997-04-12 Well Began Production
1997-04-12 Well Fluid changed to Crude Bitumen
1997-04-12 Well Mode changed to Pumping
1997-07-14 Well Log Performed
1997-07-22 Well Fluid changed to Crude Bitumen
1997-07-22 Well Mode changed to Abandoned Zone
1997-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-23 Plug Back Performed
1997-07-24 Perforation Treatment Performed - Jet Perforation
1997-07-24 Well Log Performed
1999-08-31 Perforation Treatment Performed - Chemical Squeeze
2003-01-16 Perforation Treatment Performed - Chemical Squeeze
2008-02-29 Perforation Treatment Performed - Chemical Squeeze
2011-11-29 Perforation Treatment Performed - Cement Plug
2011-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-30 Plug Back Performed
2011-12-07 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-03-06 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-03 Perforation 477.50 479.50 30
1997-04-03 Perforation 480.20 483.00 20
1997-07-23 Packing Device Capped w/Cement 467.50 475.50 0
1997-07-24 Perforation 427.00 430.50 20
1999-08-31 Chemical Squeeze 427.50 430.50 0
2003-01-16 Chemical Squeeze 427.00 430.50 0
2008-02-29 Chemical Squeeze 427.00 430.50 0
2011-11-29 Cement Plug 430.00 468.00 0
2011-11-30 Packing Device Capped w/Cement 390.00 417.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 648 0.0 0.0 0.0

For data sources see[6]

References