X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0564030211002

Well Details

Well ID: 0564030211002
Loading map...
Location: 00/11-02-056-03W4/2
Location Alias: 00/11-02-56-03 W4M
Location Alias 2: 00/11-02-056-03 W4/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 4
Range: 03
Section: 02
County/Municipality: County of Vermilion River
Well Name: PVR 11B FROG LAKE 11-2-56-3
Operator Name: Canadian Natural Resources Limited
License Number: 0187252
License Date: 1996-04-18
License Status: Abandoned
Spud Date: 1996-06-05
Final Drill Date: 1996-06-06
Well Total Depth: 644.00 m
Surface Hole Latitude: 53.813529
Surface Hole Longitude: -110.343342

For data sources see[1][2]

Well History

Date Event
1996-04-18 Obtained License
1996-06-05 Direction Drilling Operation Performed - Deviate
1996-06-05 Surface Casing Operation Performed
1996-06-06 Finished Drilling
1996-06-06 Well Log Performed
1996-06-06 Well Mode changed to Drilled and Cased
1996-06-07 Production Casing Operation Performed
1996-06-07 Rig Released
1996-06-17 Well Log Performed
1996-07-06 Well Log Performed
1996-07-07 Perforation Treatment Performed - Jet Perforation
2002-01-17 Perforation Treatment Performed - Chemical Squeeze
2002-05-21 Perforation Treatment Performed - Chemical Squeeze
2007-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-27 Perforation Treatment Performed - Jet Perforation
2007-01-27 Plug Back Performed
2007-01-27 Well Log Performed
2007-01-29 Well Began Production
2007-01-29 Well Fluid changed to Crude Bitumen
2007-01-29 Well Mode changed to Pumping
2009-09-30 Well Fluid changed to Crude Bitumen
2009-09-30 Well Mode changed to Suspended
2012-06-01 Well Fluid changed to Crude Bitumen
2012-06-01 Well Mode changed to Pumping
2012-06-17 Perforation Treatment Performed - Jet Perforation
2012-06-17 Well Log Performed
2013-09-30 Well Fluid changed to Crude Bitumen
2013-09-30 Well Mode changed to Suspended
2019-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-05 Plug Back Performed
2019-06-05 Well Fluid changed to Crude Bitumen
2019-06-05 Well Mode changed to Abandoned Zone
2019-09-25 Well Abandoned
2019-09-25 Well Fluid changed to Crude Bitumen
2019-09-25 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-05 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-07 Perforation 617.50 621.00 30
2002-01-17 Chemical Squeeze 617.50 621.00 0
2002-05-21 Chemical Squeeze 617.50 621.00 0
2007-01-27 Packing Device Capped w/Cement 596.80 615.80 0
2007-01-27 Perforation 520.50 524.50 20
2012-06-17 Perforation 526.50 528.00 20
2012-06-17 Perforation 529.00 530.00 20
2019-06-05 Packing Device Capped w/Cement 500.50 510.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 7796 0.0 0.0 0.0
2008 8208 0.0 0.0 0.0
2009 6 0.0 0.0 0.0
2012 3740 0.0 0.0 0.0
2013 1146 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-19 No Incident Encountered 0.00 0.00
2019-06-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References