X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555242516020

Well Details

Well ID: 0555242516020
Loading map...
Location: 02/16-25-055-24W5/0
Location Alias: 02/16-25-55-24 W5M
Location Alias 2: 02/16-25-055-24 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 24
Section: 25
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ02 WILD RIV 16-25-55-24
Operator Name: Tourmaline Oil Corp.
License Number: 0492899
License Date: 2018-12-20
License Status: Issued
Spud Date: 2018-12-29
Final Drill Date: 2019-01-10
Well Total Depth: 4525.00 m
Surface Hole Latitude: 53.774382
Surface Hole Longitude: -117.438932

For data sources see[1][2]

Well History

Date Event
2018-12-20 Obtained License
2018-12-30 Direction Drilling Operation Performed - Deviate
2018-12-30 Surface Casing Operation Performed
2019-01-03 Intermediate Casing Operation Performed
2019-01-07 Direction Drilling Operation Performed - Horizontal
2019-01-10 Finished Drilling
2019-01-10 Well Log Performed
2019-01-10 Well Mode changed to Drilled and Cased
2019-01-11 Production Casing Operation Performed
2019-01-11 Rig Released
2019-01-11 Well Log Performed
2019-01-29 Well Log Performed
2019-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-10 Well Began Production
2019-02-10 Well Fluid changed to Gas
2019-02-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-29 Nabors Drilling Canada Limited 77E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-12-30 120.00 Deviate (5 - 79 degrees)
2019-01-07 3087.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-09 Multi-Stage Fracture 4468.20 4468.30 0
2019-02-09 Multi-Stage Fracture 4001.60 4001.70 0
2019-02-09 Multi-Stage Fracture 3948.90 3949.00 0
2019-02-09 Multi-Stage Fracture 3896.00 3896.10 0
2019-02-09 Multi-Stage Fracture 3843.10 3843.20 0
2019-02-09 Multi-Stage Fracture 3790.10 3790.20 0
2019-02-09 Multi-Stage Fracture 3737.30 3737.40 0
2019-02-10 Multi-Stage Fracture 3684.40 3684.50 0
2019-02-10 Multi-Stage Fracture 3632.00 3632.10 0
2019-02-10 Multi-Stage Fracture 3579.20 3579.30 0
2019-02-10 Multi-Stage Fracture 3526.50 3526.60 0
2019-02-09 Multi-Stage Fracture 4423.20 4423.30 0
2019-02-10 Multi-Stage Fracture 3473.50 3473.60 0
2019-02-10 Multi-Stage Fracture 3420.70 3420.80 0
2019-02-10 Multi-Stage Fracture 3367.70 3367.80 0
2019-02-10 Multi-Stage Fracture 3327.40 3327.50 0
2019-02-10 Multi-Stage Fracture 3287.20 3287.30 0
2019-02-09 Multi-Stage Fracture 4370.80 4370.90 0
2019-02-09 Multi-Stage Fracture 4317.80 4317.90 0
2019-02-09 Multi-Stage Fracture 4265.20 4265.30 0
2019-02-09 Multi-Stage Fracture 4212.80 4212.90 0
2019-02-09 Multi-Stage Fracture 4159.80 4159.90 0
2019-02-09 Multi-Stage Fracture 4106.90 4107.00 0
2019-02-09 Multi-Stage Fracture 4054.00 4054.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-09 2019-02-10 2,967 5,247 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.8246 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.7659 N/A
silica crystalline 14808-60-7 100 3.7659 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.2978 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.9177 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0109 N/A
dibromoacetonitrile 3252-43-5 100 0.0109 N/A
non-hazardous ingredients Not Available 100 0.0109 N/A
polyethylene glycol 25322-68-3 100 0.0109 N/A
sodium bromide 7647-15-6 100 0.0109 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0889 N/A
water Not Available 100 0.0889 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0498 N/A
non-hazardous ingredients Not Available 100 0.0498 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0441 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0441 N/A
methanol 67-56-1 100 0.0441 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0441 N/A
non-hazardous ingredients Not Available 100 0.0441 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-02 2019-02-02 Recycled Fracturing Water (treated at well site) 1056
2019-02-02 2019-02-10 Recycled Fracturing Water (treated at well site) 2095
2019-02-02 2019-02-10 Recycled Fracturing Water (treated at well site) 2096

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7727 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-10 No Incident Encountered 0.00 0.00
2019-02-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References