X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555233312002

Well Details

Well ID: 0555233312002
Loading map...
Location: 00/12-33-055-23W5/2
Location Alias: 00/12-33-55-23 W5M
Location Alias 2: 00/12-33-055-23 W5/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 23
Section: 33
County/Municipality: Yellowhead County
Well Name: TALISMAN ET AL WILDR 12-33-55-23
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0179142
License Date: 1995-07-10
License Status: Amended
Spud Date: 1995-08-19
Final Drill Date: 1995-09-21
Well Total Depth: 3168.00 m
Surface Hole Latitude: 53.797874
Surface Hole Longitude: -117.367482

For data sources see[1][2]

Well History

Date Event
1995-07-10 Obtained License
1995-08-21 Surface Casing Operation Performed
1995-09-21 Finished Drilling
1995-09-21 Well Mode changed to Drilled and Cased
1995-09-22 Well Log Performed
1995-09-26 Production Casing Operation Performed
1995-10-01 Rig Released
1995-10-01 Well Log Performed
1995-10-12 Well Log Performed
1995-10-13 Perforation Treatment Performed - Jet Perforation
1995-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-15 Perforation Treatment Performed - Cement Squeeze
1995-10-20 Well Log Performed
1995-10-21 Well Log Performed
1995-10-24 Perforation Treatment Performed - Jet Perforation
1995-10-28 Perforation Treatment Performed - Fractured
1995-10-30 Well Log Performed
1995-11-08 Perforation Treatment Performed - Jet Perforation
1995-11-08 Well Log Performed
1995-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-10 Perforation Treatment Performed - Cement Squeeze
1995-11-15 Well Log Performed
1995-11-16 Perforation Treatment Performed - Jet Perforation
1995-11-20 Perforation Treatment Performed - Fractured
1995-11-27 Perforation Treatment Performed - Jet Perforation
1995-11-27 Well Log Performed
1995-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-03 Perforation Treatment Performed - Cement Squeeze
1995-12-23 Well Began Production
1995-12-23 Well Fluid changed to Gas
1995-12-23 Well Mode changed to Flowing
1996-02-28 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-13 Perforation 3090.00 3091.00 13
1995-11-10 Acid Treatment 3030.00 3031.00 0
1995-11-10 Cement Squeeze 2990.00 3031.00 0
1995-11-16 Perforation 3007.00 3013.00 17
1995-11-20 Fracture 3007.00 3013.00 0
1995-11-27 Perforation 1707.00 1711.00 17
1995-12-01 Acid Treatment 1707.00 1711.00 0
1995-12-03 Cement Squeeze 1707.00 1711.00 0
1995-10-13 Perforation 3122.00 3123.00 13
1995-10-15 Acid Treatment 3122.00 3123.00 0
1995-10-15 Cement Squeeze 3090.00 3123.00 0
1995-10-24 Perforation 3136.00 3138.00 17
1995-10-24 Perforation 3140.00 3142.00 17
1995-10-28 Fracture 3136.00 3142.00 0
1995-11-08 Perforation 2990.00 2991.00 17
1995-11-08 Perforation 3030.00 3031.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 216 0.0 0.0 0.0
1996 733 0.0 0.0 0.0

For data sources see[5]

References