If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0555222013020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.774282,"lon":-117.227065,"icon":""}]} |
Location: 02/13-20-055-22W5/0 | |
Location Alias: 02/13-20-55-22 W5M | |
Location Alias 2: 02/13-20-055-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 5 | |
Range: 22 | |
Section: 20 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE 102 SUNDANCE 13-20-55-22 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0457176 | |
License Date: 2013-05-27 | |
License Status: Issued | |
Spud Date: 2013-08-08 | |
Final Drill Date: 2013-09-02 | |
Well Total Depth: 4040.00 m | |
Surface Hole Latitude: 53.774282 | |
Surface Hole Longitude: -117.227065 |
Date | Event |
---|---|
2013-05-27 | Obtained License |
2013-08-10 | Surface Casing Operation Performed |
2013-08-15 | Intermediate Casing Operation Performed |
2013-08-18 | Direction Drilling Operation Performed - Deviate |
2013-08-21 | Direction Drilling Operation Performed - Horizontal |
2013-08-22 | Well Log Performed |
2013-08-23 | Well Log Performed |
2013-09-02 | Finished Drilling |
2013-09-02 | Well Log Performed |
2013-09-02 | Well Mode changed to Drilled and Cased |
2013-09-06 | Production Casing Operation Performed |
2013-09-06 | Rig Released |
2013-09-19 | Well Log Performed |
2013-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-09-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-09-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-02-01 | Well Began Production |
2014-02-01 | Well Fluid changed to Gas |
2014-02-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-08-08 | Patterson-UTI Drilling Co. Canada | 17E | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-08-18 | 2652.20 | Deviate (5 - 79 degrees) |
2013-08-21 | 3117.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-09-22 | Multi-Stage Fracture | 4016.70 | 4016.80 | 0 |
2013-09-23 | Multi-Stage Fracture | 3560.90 | 3561.00 | 0 |
2013-09-23 | Multi-Stage Fracture | 3505.20 | 3505.30 | 0 |
2013-09-23 | Multi-Stage Fracture | 3462.00 | 3462.10 | 0 |
2013-09-23 | Multi-Stage Fracture | 3406.60 | 3406.70 | 0 |
2013-09-24 | Multi-Stage Fracture | 3307.60 | 3307.70 | 0 |
2013-09-24 | Multi-Stage Fracture | 3251.70 | 3251.80 | 0 |
2013-09-24 | Multi-Stage Fracture | 3208.30 | 3208.40 | 0 |
2013-09-24 | Multi-Stage Fracture | 3152.90 | 3153.00 | 0 |
2013-09-22 | Multi-Stage Fracture | 3964.20 | 3964.30 | 0 |
2013-09-22 | Multi-Stage Fracture | 3909.50 | 3909.60 | 0 |
2013-09-22 | Multi-Stage Fracture | 3865.90 | 3866.00 | 0 |
2013-09-22 | Multi-Stage Fracture | 3811.20 | 3811.30 | 0 |
2013-09-23 | Multi-Stage Fracture | 3768.00 | 3768.10 | 0 |
2013-09-23 | Multi-Stage Fracture | 3713.10 | 3713.20 | 0 |
2013-09-23 | Multi-Stage Fracture | 3658.50 | 3658.60 | 0 |
2013-09-23 | Multi-Stage Fracture | 3615.90 | 3616.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-22 | 2013-09-24 | 2,918 | 5,058 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 84.525 | N/A | |||
Prime Plus (40/70) | Trican | hexamethylenetetramine | 100-97-0 | 100 | 5.2291 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 5.2291 | N/A | ||||
Sand (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 9.5472 | N/A | ||
Sand (50/140) | Trican | silica crystalline | 14808-60-7 | 100 | 1.277 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0146 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0146 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0146 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0146 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0146 | N/A | ||||
CC-77 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.1887 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1887 | N/A | ||||
FR-9 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0911 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0911 | N/A | ||||
S- 2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.0711 | N/A | |
isopropanol | 67-63-0 | 100 | 0.0711 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0711 | N/A | ||||
oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.0711 | N/A | ||||
solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.0711 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-09-12 | 2013-09-15 | Surface Water - River | 3175 |
2013-09-16 | 2013-09-23 | Recycled Fracturing Water (treated at well site) | 2338 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 7704 | 0.0 | 0.0 | 0.0 |
2015 | 8711 | 0.0 | 0.0 | 0.0 |
2016 | 8706 | 0.0 | 0.0 | 0.0 |
2017 | 8735 | 0.0 | 0.0 | 0.0 |
2018 | 8688 | 0.0 | 0.0 | 0.0 |
2019 | 8207 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-09-02 | No Incident Encountered | 0.00 | 0.00 |
2013-10-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]