X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555211015000

Well Details

Well ID: 0555211015000
Loading map...
Location: 00/15-10-055-21W5/0
Location Alias: 00/15-10-55-21 W5M
Location Alias 2: 00/15-10-055-21 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 21
Section: 10
County/Municipality: Yellowhead County
Well Name: PEYTO SUNDANCE 15-10-55-21
Operator Name: Peyto Exploration & Development Corp.
License Number: 0493838
License Date: 2019-02-21
License Status: Issued
Spud Date: 2019-03-15
Final Drill Date: 2019-03-26
Well Total Depth: 4004.00 m
Surface Hole Latitude: 53.727137
Surface Hole Longitude: -117.027805

For data sources see[1][2]

Well History

Date Event
2019-02-21 Obtained License
2019-03-16 Surface Casing Operation Performed
2019-03-17 Direction Drilling Operation Performed - Deviate
2019-03-19 Direction Drilling Operation Performed - Horizontal
2019-03-26 Finished Drilling
2019-03-26 Well Log Performed
2019-03-26 Well Mode changed to Drilled and Cased
2019-03-28 Liner Casing Operation Performed
2019-03-28 Perforation Treatment Performed - Open-Hole Completion
2019-03-28 Production Casing Operation Performed
2019-03-29 Rig Released
2019-06-16 Well Log Performed
2019-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-26 Well Began Production
2019-07-26 Well Fluid changed to Gas
2019-07-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-03-15 Savanna Drilling Corp. 634 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-17 1642.00 Deviate (5 - 79 degrees)
2019-03-19 2438.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-28 Open Hole/Barefoot Completion 3986.00 4004.00 0
2019-06-18 Multi-Stage Fracture 3606.60 3606.70 0
2019-06-18 Multi-Stage Fracture 3565.80 3565.90 0
2019-06-18 Multi-Stage Fracture 3524.70 3524.80 0
2019-06-18 Multi-Stage Fracture 3483.70 3483.80 0
2019-06-18 Multi-Stage Fracture 3442.80 3442.90 0
2019-06-18 Multi-Stage Fracture 3400.80 3400.90 0
2019-06-18 Multi-Stage Fracture 3358.90 3359.00 0
2019-06-18 Multi-Stage Fracture 3316.80 3316.90 0
2019-06-18 Multi-Stage Fracture 3275.20 3275.30 0
2019-06-18 Multi-Stage Fracture 3233.60 3233.70 0
2019-06-18 Multi-Stage Fracture 3944.80 3944.90 0
2019-06-18 Multi-Stage Fracture 3192.30 3192.40 0
2019-06-18 Multi-Stage Fracture 3150.20 3150.30 0
2019-06-18 Multi-Stage Fracture 3108.10 3108.20 0
2019-06-18 Multi-Stage Fracture 3066.60 3066.70 0
2019-06-18 Multi-Stage Fracture 3024.80 3024.90 0
2019-06-18 Multi-Stage Fracture 2982.70 2982.80 0
2019-06-18 Multi-Stage Fracture 2940.90 2941.00 0
2019-06-18 Multi-Stage Fracture 2899.40 2899.50 0
2019-06-18 Multi-Stage Fracture 2831.10 2831.20 0
2019-06-18 Multi-Stage Fracture 2735.90 2736.00 0
2019-06-18 Multi-Stage Fracture 3903.80 3903.90 0
2019-06-18 Multi-Stage Fracture 2680.50 2680.60 0
2019-06-18 Multi-Stage Fracture 2638.90 2639.00 0
2019-06-18 Multi-Stage Fracture 2596.50 2596.60 0
2019-06-18 Multi-Stage Fracture 3863.30 3863.40 0
2019-06-18 Multi-Stage Fracture 3824.40 3824.50 0
2019-06-18 Multi-Stage Fracture 3783.90 3784.00 0
2019-06-18 Multi-Stage Fracture 3730.90 3731.00 0
2019-06-18 Multi-Stage Fracture 3689.30 3689.40 0
2019-06-18 Multi-Stage Fracture 3648.60 3648.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-06-18 2019-06-18 2,254 3,621 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 3.1283 N/A
water Not Available 100 82.7378 N/A
Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 13.953 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0153 N/A
dibromoacetonitrile 3252-43-5 100 0.0153 N/A
non-hazardous ingredients Not Available 100 0.0153 N/A
polyethylene glycol 25322-68-3 100 0.0153 N/A
sodium bromide 7647-15-6 100 0.0153 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0433 N/A
FR-24 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0487 N/A
non-hazardous ingredients Not Available 100 0.0487 N/A
GSI-1W Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0291 N/A
propylene glycol 57-55-6 100 0.0291 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0442 N/A
non-hazardous ingredients Not Available 100 0.0442 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-06-10 2019-06-18 Groundwater - Non-saline less than or equal to 150m deep 2110
2019-03-19 2019-03-23 Groundwater - Non-saline less than or equal to 150m deep 1190
2019-06-14 2019-06-19 Groundwater - Non-saline less than or equal to 150m deep 925

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3660 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-29 No Incident Encountered 0.00 0.00
2019-06-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References