If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0555210215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.715815,"lon":-117.006674,"icon":""}]} |
Location: 00/15-02-055-21W5/0 | |
Location Alias: 00/15-02-55-21 W5M | |
Location Alias 2: 00/15-02-055-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 5 | |
Range: 21 | |
Section: 02 | |
County/Municipality: Yellowhead County | |
Well Name: PEYTO SUNDANCE 15-2-55-21 | |
Operator Name: Peyto Exploration & Development Corp. | |
License Number: 0478693 | |
License Date: 2016-01-07 | |
License Status: Issued | |
Spud Date: 2016-01-29 | |
Final Drill Date: 2016-02-15 | |
Well Total Depth: 4221.00 m | |
Surface Hole Latitude: 53.715815 | |
Surface Hole Longitude: -117.006674 |
Date | Event |
---|---|
2016-01-07 | Obtained License |
2016-01-31 | Surface Casing Operation Performed |
2016-02-06 | Direction Drilling Operation Performed - Deviate |
2016-02-08 | Direction Drilling Operation Performed - Horizontal |
2016-02-09 | Well Log Performed |
2016-02-10 | Intermediate Casing Operation Performed |
2016-02-15 | Finished Drilling |
2016-02-15 | Well Log Performed |
2016-02-15 | Well Mode changed to Drilled and Cased |
2016-02-17 | Liner Casing Operation Performed |
2016-02-17 | Perforation Treatment Performed - Open-Hole Completion |
2016-02-18 | Rig Released |
2016-03-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-03-22 | Well Began Production |
2016-03-22 | Well Fluid changed to Gas |
2016-03-22 | Well Mode changed to Flowing |
2018-05-23 | Well Fluid changed to Gas |
2018-05-23 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-01-29 | Savanna Drilling Corp. | 616 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-02-06 | 2435.00 | Deviate (5 - 79 degrees) |
2016-02-08 | 2953.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-02-17 | Open Hole/Barefoot Completion | 4202.00 | 4221.00 | 0 |
2016-03-21 | Multi-Stage Fracture | 3111.70 | 3111.80 | 0 |
2016-03-21 | Multi-Stage Fracture | 4192.00 | 4192.10 | 0 |
2016-03-21 | Multi-Stage Fracture | 4063.20 | 4063.30 | 0 |
2016-03-21 | Multi-Stage Fracture | 3963.40 | 3963.50 | 0 |
2016-03-21 | Multi-Stage Fracture | 3769.30 | 3769.40 | 0 |
2016-03-21 | Multi-Stage Fracture | 3642.70 | 3642.80 | 0 |
2016-03-21 | Multi-Stage Fracture | 3558.90 | 3559.00 | 0 |
2016-03-21 | Multi-Stage Fracture | 3320.10 | 3320.20 | 0 |
2016-03-21 | Multi-Stage Fracture | 3206.60 | 3206.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-03-21 | 2016-03-21 | 2,818 | 2,298 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 79.9854 | N/A | |||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 19.7968 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0399 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.04 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.04 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0399 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0399 | N/A | ||||
FR-18 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.1234 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.1234 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.1234 | N/A | ||||
SI-14 | Trican | Scale Inhibitor | methanol | 67-56-1 | 100 | 0.0158 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0158 | N/A | ||||
S-17W | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.0383 | N/A | |
methanol | 67-56-1 | 100 | 0.0383 | N/A | ||||
water | Not Available | 100 | 0.0383 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-03-19 | 2016-03-20 | Recycled Fracturing Water (treated at well site) | 1115 |
2016-03-15 | 2016-03-20 | Groundwater - Non-saline less than or equal to 150m deep | 1020 |
2016-03-10 | 2016-03-16 | Groundwater - Non-saline less than or equal to 150m deep | 675 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 5146 | 0.0 | 0.0 | 0.0 |
2017 | 7871 | 0.0 | 0.0 | 0.0 |
2018 | 8753 | 0.0 | 0.0 | 0.0 |
2019 | 8718 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-02-18 | No Incident Encountered | 0.00 | 0.00 |
2016-03-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]