X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555191112002

Well Details

Well ID: 0555191112002
Loading map...
Location: 00/12-11-055-19W5/2
Location Alias: 00/12-11-55-19 W5M
Location Alias 2: 00/12-11-055-19 W5/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 19
Section: 11
County/Municipality: Yellowhead County
Well Name: MANCAL HZ PINE CK 12-11-55-19
Operator Name: Mancal Energy Inc.
License Number: 0416899
License Date: 2010-01-07
License Status: Suspension
Spud Date: 2010-01-30
Final Drill Date: 2010-03-11
Well Total Depth: 3400.00 m
Surface Hole Latitude: 53.740122
Surface Hole Longitude: -116.696639

For data sources see[1][2]

Well History

Date Event
2010-01-07 Obtained License
2010-02-01 Surface Casing Operation Performed
2010-02-07 Direction Drilling Operation Performed - Horizontal
2010-02-16 Intermediate Casing Operation Performed
2010-02-21 Direction Drilling Operation Performed - Horizontal
2010-03-10 Well Log Performed
2010-03-11 Finished Drilling
2010-03-11 Well Log Performed
2010-03-11 Well Mode changed to Drilled and Cased
2010-03-20 Liner Casing Operation Performed
2010-03-21 Rig Released
2010-03-24 Perforation Treatment Performed - Open-Hole Completion
2010-04-02 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-23 Well Began Production
2010-04-23 Well Fluid changed to Crude Oil
2010-04-23 Well Mode changed to Flowing
2016-02-01 Well Fluid changed to Crude Oil
2016-02-01 Well Mode changed to Suspended
2017-01-20 Well Fluid changed to Crude Oil
2017-01-20 Well Mode changed to Pumping
2018-11-01 Well Fluid changed to Crude Oil
2018-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-07 1557.00 Horizontal
2010-02-21 2550.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-24 Open Hole/Barefoot Completion 2119.30 3379.40 0
2010-04-02 Multi-Stage Fracture 3348.55 3348.65 0
2010-04-02 Multi-Stage Fracture 3080.04 3080.14 0
2010-04-02 Multi-Stage Fracture 2952.75 2952.85 0
2010-04-02 Multi-Stage Fracture 2747.72 2747.82 0
2010-04-02 Multi-Stage Fracture 2506.34 2506.44 0
2010-04-02 Multi-Stage Fracture 2337.13 2337.23 0
2010-04-02 Multi-Stage Fracture 2235.87 2235.97 0
2010-04-02 Multi-Stage Fracture 2148.41 2148.51 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5358 0.0 0.0 0.0
2011 8105 0.0 0.0 0.0
2012 7442 0.0 0.0 0.0
2013 8089 0.0 0.0 0.0
2014 7631 0.0 0.0 0.0
2015 5830 0.0 0.0 0.0
2017 4138 0.0 0.0 0.0

For data sources see[6]

References