If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0555183114007 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.791441,"lon":-116.672334,"icon":""}]} |
| Location: 00/14-31-055-18W5/7 | |
| Location Alias: 00/14-31-55-18 W5M | |
| Location Alias 2: 00/14-31-055-18 W5/07 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 055 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 31 | |
| County/Municipality: Yellowhead County | |
| Well Name: BEC PINE CK 4-31-55-18 | |
| Operator Name: Bonavista Energy Corporation | |
| License Number: 0184281 | |
| License Date: 1996-01-08 | |
| License Status: Suspension | |
| Spud Date: 1996-01-09 | |
| Final Drill Date: 1996-11-05 | |
| Well Total Depth: 4608.00 m | |
| Surface Hole Latitude: 53.791441 | |
| Surface Hole Longitude: -116.672334 |
| Date | Event |
|---|---|
| 1996-01-08 | Obtained License |
| 1996-11-05 | Finished Drilling |
| 1996-11-05 | Well Log Performed |
| 1996-11-05 | Well Mode changed to Drilled and Cased |
| 1996-11-09 | Direction Drilling Operation Performed - Horizontal |
| 1996-12-06 | Well Log Performed |
| 1996-12-15 | Liner Casing Operation Performed |
| 1996-12-15 | Perforation Treatment Performed - Open-Hole Completion |
| 1996-12-15 | Rig Released |
| 2002-06-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2002-06-17 | Plug Back Performed |
| 2002-06-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2002-06-21 | Perforation Treatment Performed - Jet Perforation |
| 2002-06-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2002-06-23 | Perforation Treatment Performed - Jet Perforation |
| 2002-06-23 | Plug Back Performed |
| 2002-06-26 | Perforation Treatment Performed - Fractured |
| 2002-07-04 | Perforation Treatment Performed - Jet Perforation |
| 2002-07-06 | Perforation Treatment Performed - Cement Squeeze |
| 2002-07-07 | Perforation Treatment Performed - Cement Plug |
| 2002-07-07 | Perforation Treatment Performed - Cement Squeeze |
| 2002-07-07 | Plug Back Performed |
| 2002-07-12 | Perforation Treatment Performed - Jet Perforation |
| 2002-07-16 | Perforation Treatment Performed - Fractured |
| 2002-08-10 | Well Began Production |
| 2002-08-10 | Well Fluid changed to Gas |
| 2002-08-10 | Well Mode changed to Flowing |
| 2003-12-01 | Well Fluid changed to Gas |
| 2003-12-01 | Well Mode changed to Suspended |
| 2012-02-23 | Well Fluid changed to Gas |
| 2012-02-23 | Well Mode changed to Pumping |
| 2019-01-01 | Well Fluid changed to Gas |
| 2019-01-01 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1996-11-09 | 3480.40 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-12-15 | Open Hole/Barefoot Completion | 3775.00 | 4608.00 | 0 |
| 2002-07-07 | Cement Plug | 2650.50 | 2660.00 | 0 |
| 2002-07-07 | Cement Squeeze | 2579.50 | 2580.50 | 0 |
| 2002-07-12 | Perforation | 2609.00 | 2611.00 | 17 |
| 2002-07-12 | Perforation | 2589.00 | 2593.00 | 17 |
| 2002-07-16 | Fracture | 2609.00 | 2611.00 | 0 |
| 2002-07-16 | Fracture | 2589.00 | 2593.00 | 0 |
| 2002-06-17 | Packing Device Capped w/Cement | 3307.00 | 3315.00 | 0 |
| 2002-06-21 | Perforation | 2737.00 | 2740.00 | 17 |
| 2002-06-21 | Acid Treatment | 2737.00 | 2740.00 | 0 |
| 2002-06-23 | Packing Device Capped w/Cement | 2723.00 | 2731.00 | 0 |
| 2002-06-23 | Perforation | 2664.00 | 2670.00 | 17 |
| 2002-06-26 | Fracture | 2664.00 | 2670.00 | 0 |
| 2002-07-04 | Perforation | 2579.50 | 2580.50 | 17 |
| 2002-07-06 | Cement Squeeze | 2664.00 | 2670.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2002 | 1915 | 0.0 | 0.0 | 0.0 |
| 2003 | 2205 | 0.0 | 0.0 | 0.0 |
| 2012 | 5954 | 0.0 | 0.0 | 0.0 |
| 2013 | 7414 | 0.0 | 0.0 | 0.0 |
| 2014 | 4372 | 0.0 | 0.0 | 0.0 |
| 2015 | 8590 | 0.0 | 0.0 | 0.0 |
| 2016 | 7668 | 0.0 | 0.0 | 0.0 |
| 2017 | 73 | 0.0 | 0.0 | 0.0 |
For data sources see[6]