X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555180309000

Well Details

Well ID: 0555180309000
Loading map...
Location: 00/09-03-055-18W5/0
Location Alias: 00/09-03-55-18 W5M
Location Alias 2: 00/09-03-055-18 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 18
Section: 03
County/Municipality: Yellowhead County
Well Name: LONG RUN EDSON 9-3-55-18
Operator Name: Long Run Exploration Ltd.
License Number: 0433561
License Date: 2011-05-16
License Status: Issued
Spud Date: 2011-07-28
Final Drill Date: 2011-08-16
Well Total Depth: 3176.00 m
Surface Hole Latitude: 53.724802
Surface Hole Longitude: -116.600994

For data sources see[1][2]

Well History

Date Event
2011-05-16 Obtained License
2011-07-31 Surface Casing Operation Performed
2011-08-04 Direction Drilling Operation Performed - Horizontal
2011-08-12 Intermediate Casing Operation Performed
2011-08-12 Well Log Performed
2011-08-16 Finished Drilling
2011-08-16 Well Mode changed to Drilled and Cased
2011-08-18 Liner Casing Operation Performed
2011-08-21 Rig Released
2011-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-03 Well Began Production
2011-10-03 Well Fluid changed to Crude Oil
2011-10-03 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-04 1620.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-09 Multi-Stage Fracture 3125.50 3125.60 0
2011-09-09 Multi-Stage Fracture 2274.20 2274.30 0
2011-09-09 Multi-Stage Fracture 2181.00 2181.10 0
2011-09-09 Multi-Stage Fracture 2087.70 2087.80 0
2011-09-09 Multi-Stage Fracture 1994.90 1995.00 0
2011-09-09 Multi-Stage Fracture 3039.50 3039.60 0
2011-09-09 Multi-Stage Fracture 2933.70 2933.80 0
2011-09-09 Multi-Stage Fracture 2841.30 2841.40 0
2011-09-09 Multi-Stage Fracture 2748.40 2748.50 0
2011-09-09 Multi-Stage Fracture 2655.50 2655.60 0
2011-09-09 Multi-Stage Fracture 2563.70 2563.80 0
2011-09-09 Multi-Stage Fracture 2460.20 2460.30 0
2011-09-09 Multi-Stage Fracture 2366.80 2366.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2160 0.0 0.0 0.0
2012 8280 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8700 0.0 0.0 0.0
2018 8629 0.0 0.0 0.0
2019 8264 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References