If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0555051606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.750634,"lon":-114.688288,"icon":""}]} |
Location: 00/06-16-055-05W5/0 | |
Location Alias: 00/06-16-55-05 W5M | |
Location Alias 2: 00/06-16-055-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 055 | |
Meridian: 5 | |
Range: 05 | |
Section: 16 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: SYMMETRY ET AL ST. ANNE 6-16-55-5 | |
Operator Name: TAQA North Ltd. | |
License Number: 0143746 | |
License Date: 1990-03-15 | |
License Status: Suspension | |
Spud Date: 1990-03-18 | |
Final Drill Date: 1990-03-26 | |
Well Total Depth: 1520.00 m | |
Surface Hole Latitude: 53.750634 | |
Surface Hole Longitude: -114.688288 |
Date | Event |
---|---|
1990-03-15 | Obtained License |
1990-03-18 | Well Log Performed |
1990-03-19 | Surface Casing Operation Performed |
1990-03-26 | Finished Drilling |
1990-03-26 | Well Log Performed |
1990-03-26 | Well Mode changed to Drilled and Cased |
1990-03-27 | Drill Stem Test Performed |
1990-03-29 | Drill Stem Test Performed |
1990-03-30 | Production Casing Operation Performed |
1990-03-30 | Rig Released |
1990-05-30 | Well Log Performed |
1990-06-01 | Perforation Treatment Performed - Jet Perforation |
1990-06-01 | Well Log Performed |
1990-06-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-06-07 | Well Began Production |
1990-06-07 | Well Fluid changed to Crude Oil |
1990-06-07 | Well Mode changed to Pumping |
1990-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-06-22 | Perforation Treatment Performed - Fractured |
2000-04-26 | Well Log Performed |
2000-04-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-05-25 | Well Began Injection |
2000-05-25 | Well Fluid changed to Water |
2000-05-25 | Well Type changed to Injection |
2000-07-19 | Well Log Performed |
2000-07-24 | Well Log Performed |
2001-03-31 | Well Fluid changed to Water |
2001-03-31 | Well Mode changed to Suspended |
2001-03-31 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-06-01 | Perforation | 1455.00 | 1461.00 | 13 |
1990-06-02 | Acid Treatment | 1455.00 | 1461.00 | 0 |
1990-06-16 | Acid Treatment | 1455.00 | 1461.00 | 0 |
1990-06-22 | Fracture | 1455.00 | 1461.00 | 0 |
2000-04-27 | Acid Treatment | 1455.00 | 1461.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 3723 | 0.0 | 0.0 | 0.0 |
1991 | 8409 | 0.0 | 0.0 | 0.0 |
1992 | 8509 | 0.0 | 0.0 | 0.0 |
1993 | 8759 | 0.0 | 0.0 | 0.0 |
1994 | 8264 | 0.0 | 0.0 | 0.0 |
1995 | 8495 | 0.0 | 0.0 | 0.0 |
1996 | 7907 | 0.0 | 0.0 | 0.0 |
1997 | 8569 | 0.0 | 0.0 | 0.0 |
1998 | 7978 | 0.0 | 0.0 | 0.0 |
1999 | 8759 | 0.0 | 0.0 | 0.0 |
2000 | 2736 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]