X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555051102002

Well Details

Well ID: 0555051102002
Loading map...
Location: 00/02-11-055-05W5/2
Location Alias: 00/02-11-55-05 W5M
Location Alias 2: 00/02-11-055-05 W5/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 05
Section: 11
County/Municipality: Lac Ste. Anne County
Well Name: SYMMETRY ET AL ST. ANNE 2-11-55-5
Operator Name: TAQA North Ltd.
License Number: 0102608
License Date: 1983-08-08
License Status: Suspension
Spud Date: 1983-08-24
Final Drill Date: 1983-08-30
Well Total Depth: 1461.00 m
Surface Hole Latitude: 53.732792
Surface Hole Longitude: -114.632174

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-08-08 Obtained License
1983-08-30 Finished Drilling
1983-08-30 Well Mode changed to Drilled and Cased
1983-08-31 Production Casing Operation Performed
1983-09-03 Perforation Treatment Performed - Jet Perforation
1984-03-15 Perforation Treatment Performed - Jet Perforation
1984-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-23 Perforation Treatment Performed - Cement Squeeze
1984-03-26 Perforation Treatment Performed - Jet Perforation
1984-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-11-08 Perforation Treatment Performed - Jet Perforation
2010-11-08 Well Log Performed
2010-11-23 Well Fluid changed to Gas
2010-11-23 Well Mode changed to Testing
2010-11-24 Well Began Production
2010-11-24 Well Fluid changed to Gas
2010-11-24 Well Mode changed to Flowing
2014-03-01 Well Fluid changed to Gas
2014-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-03 Perforation 1429.50 1431.50 14
1984-03-15 Perforation 1434.50 1435.50 13
1984-03-18 Acid Treatment 1429.50 1431.50 0
1984-03-23 Cement Squeeze 1429.50 1431.50 0
1984-03-26 Perforation 1434.50 1435.50 13
1984-03-29 Acid Treatment 1434.50 1435.50 0
1984-03-31 Acid Treatment 1434.50 1435.50 0
2010-11-08 Perforation 1216.50 1218.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 87 0.0 0.0 0.0
2011 2755 0.0 0.0 0.0
2013 1 0.0 0.0 0.0

For data sources see[5]

References