X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0555021615000

Well Details

Well ID: 0555021615000
Loading map...
Location: 00/15-16-055-02W5/0
Location Alias: 00/15-16-55-02 W5M
Location Alias 2: 00/15-16-055-02 W5/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 5
Range: 02
Section: 16
County/Municipality: Lac Ste. Anne County
Well Name: PLACID LAKE ST. ANNE NO. 1
Operator Name: Placid Oil Company
License Number: 0003623
License Date: 1951-10-17
License Status: RecExempt
Spud Date: 1951-11-30
Final Drill Date: 1952-02-03
Well Total Depth: 1937.00 m
Surface Hole Latitude: 53.757294
Surface Hole Longitude: -114.234195

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-10-17 Obtained License
1951-12-10 Drill Stem Test Performed
1951-12-18 Drill Stem Test Performed
1952-01-02 Drill Stem Test Performed
1952-01-10 Drill Stem Test Performed
1952-01-12 Drill Stem Test Performed
1952-02-03 Finished Drilling
1952-02-03 Well Mode changed to Drilled and Cased
1952-02-06 Production Casing Operation Performed
1952-02-09 Perforation Treatment Performed - Acid Wash - No Pressure
1952-02-09 Perforation Treatment Performed - Bullet Perforation
1952-02-12 Perforation Treatment Performed - Bullet Perforation
1952-02-29 Perforation Treatment Performed - Acid Wash - No Pressure
1952-05-16 Well Began Production
1952-05-16 Well Fluid changed to Crude Oil
1952-05-16 Well Mode changed to Pumping
1955-08-11 Perforation Treatment Performed - Bullet Perforation
1955-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-07-07 Perforation Treatment Performed - Cement Plug
1956-07-17 Well Abandoned
1956-07-17 Well Fluid changed to Crude Oil
1956-07-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-02-09 Bullet Perforation 1404.80 1407.00 20
1956-07-07 Cement Plug 1371.60 1402.40 0
1952-02-09 Acid Wash 1404.80 1407.00 0
1952-02-12 Bullet Perforation 1388.70 1396.00 20
1952-02-12 Bullet Perforation 1397.20 1398.40 20
1952-02-12 Bullet Perforation 1400.30 1403.00 20
1952-02-29 Acid Wash 1388.70 1407.00 0
1955-08-11 Bullet Perforation 1387.40 1392.00 13
1955-08-13 Acid Treatment 1387.40 1407.00 0
1955-08-15 Acid Treatment 1387.40 1392.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References