X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554251602000

Well Details

Well ID: 0554251602000
Loading map...
Location: 00/02-16-055-25W4/0
Location Alias: 00/02-16-55-25 W4M
Location Alias 2: 00/02-16-055-25 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 25
Section: 16
County/Municipality: Sturgeon County
Well Name: IMPERIAL VOLMER NO. 1
Operator Name: Imperial Oil Limited
License Number: B0002037
License Date: 1948-02-27
License Status: RecExempt
Spud Date: 1948-03-11
Final Drill Date: 1948-06-24
Well Total Depth: 2216.50 m
Surface Hole Latitude: 53.747557
Surface Hole Longitude: -113.654649

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-02-27 Obtained License
1948-03-29 Drill Stem Test Performed
1948-04-03 Drill Stem Test Performed
1948-04-05 Drill Stem Test Performed
1948-04-08 Drill Stem Test Performed
1948-04-09 Drill Stem Test Performed
1948-04-15 Drill Stem Test Performed
1948-04-23 Drill Stem Test Performed
1948-04-28 Drill Stem Test Performed
1948-05-02 Drill Stem Test Performed
1948-05-03 Drill Stem Test Performed
1948-05-04 Drill Stem Test Performed
1948-05-10 Drill Stem Test Performed
1948-06-24 Finished Drilling
1948-06-24 Well Mode changed to Drilled and Cased
1948-07-03 Production Casing Operation Performed
1948-07-07 Perforation Treatment Performed - Bullet Perforation
1948-07-10 Perforation Treatment Performed - Bullet Perforation
1948-07-11 Perforation Treatment Performed - Cement Squeeze
1948-07-14 Perforation Treatment Performed - Bullet Perforation
1948-07-17 Perforation Treatment Performed - Bullet Perforation
1948-07-25 Perforation Treatment Performed - Cement Squeeze
1948-07-29 Perforation Treatment Performed - Bullet Perforation
1948-07-30 Perforation Treatment Performed - Bullet Perforation
1948-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1948-08-03 Perforation Treatment Performed - Cement Plug
1948-08-05 Well Fluid changed to Crude Oil
1948-08-05 Well Mode changed to Potential
1948-08-06 Well Fluid changed to Crude Oil
1948-08-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-07-07 Bullet Perforation 1118.60 1120.10 16
1948-08-01 Acid Treatment 1116.20 1119.80 0
1948-08-03 Cement Plug 1095.50 1150.90 0
1948-07-10 Bullet Perforation 1121.40 1123.20 10
1948-07-11 Cement Squeeze 1121.40 1123.20 0
1948-07-14 Bullet Perforation 1118.60 1119.50 10
1948-07-17 Bullet Perforation 1118.30 1118.60 10
1948-07-17 Bullet Perforation 1118.60 1119.50 10
1948-07-25 Cement Squeeze 1118.30 1123.20 0
1948-07-29 Bullet Perforation 1116.20 1119.80 3
1948-07-30 Bullet Perforation 1116.20 1118.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References