X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554192115020

Well Details

Well ID: 0554192115020
Loading map...
Location: 02/15-21-055-19W4/0
Location Alias: 02/15-21-55-19 W4M
Location Alias 2: 02/15-21-055-19 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 19
Section: 21
County/Municipality: Lamont
Well Name: TAC 102 HZ REDWATER 15-21-55-19
Operator Name: Tamarack Acquisition Corp.
License Number: 0435460
License Date: 2011-07-26
License Status: Suspension
Spud Date: 2011-09-23
Final Drill Date: 2011-09-26
Well Total Depth: 1463.00 m
Surface Hole Latitude: 53.765356
Surface Hole Longitude: -112.759219

For data sources see[1][2]

Well History

Date Event
2011-07-26 Obtained License
2011-09-23 Surface Casing Operation Performed
2011-09-24 Direction Drilling Operation Performed - Horizontal
2011-09-24 Well Log Performed
2011-09-26 Finished Drilling
2011-09-26 Well Log Performed
2011-09-26 Well Mode changed to Drilled and Cased
2011-09-27 Production Casing Operation Performed
2011-09-27 Rig Released
2011-09-30 Well Log Performed
2011-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-19 Well Began Production
2011-10-19 Well Fluid changed to Crude Oil
2011-10-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-24 322.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-09 Multi-Stage Fracture 1420.70 1421.10 0
2011-10-09 Multi-Stage Fracture 979.10 979.50 0
2011-10-09 Multi-Stage Fracture 1365.90 1366.30 0
2011-10-09 Multi-Stage Fracture 1234.00 1324.40 0
2011-10-09 Multi-Stage Fracture 1269.30 1269.70 0
2011-10-09 Multi-Stage Fracture 1227.40 1227.80 0
2011-10-09 Multi-Stage Fracture 1172.30 1172.70 0
2011-10-09 Multi-Stage Fracture 1130.40 1130.80 0
2011-10-09 Multi-Stage Fracture 1075.70 1076.10 0
2011-10-09 Multi-Stage Fracture 1033.80 1034.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1609 0.0 0.0 0.0
2012 8566 0.0 0.0 0.0
2013 8660 0.0 0.0 0.0
2014 8576 0.0 0.0 0.0
2015 8539 0.0 0.0 0.0
2016 8593 0.0 0.0 0.0
2017 8155 0.0 0.0 0.0

For data sources see[6]

References