X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554160801002

Well Details

Well ID: 0554160801002
Loading map...
Location: 00/01-08-055-16W4/2
Location Alias: 00/01-08-55-16 W4M
Location Alias 2: 00/01-08-055-16 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 16
Section: 08
County/Municipality: Lamont County
Well Name: PINE CLIFF WILDON 1-8-55-16
Operator Name: Pine Cliff Energy Ltd.
License Number: 0090866
License Date: 1981-06-23
License Status: Abandoned
Spud Date: 1981-06-22
Final Drill Date: 1981-06-26
Well Total Depth: 860.00 m
Surface Hole Latitude: 53.732802
Surface Hole Longitude: -112.337381

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-23 Obtained License
1981-06-24 Drill Stem Test Performed
1981-06-26 Drill Stem Test Performed
1981-06-26 Finished Drilling
1981-06-27 Drill Stem Test Performed
1981-06-28 Production Casing Operation Performed
1981-11-03 Perforation Treatment Performed - Jet Perforation
1981-11-05 Perforation Treatment Performed - Jet Perforation
1982-04-01 Well Mode changed to Drilled and Cased
1982-06-01 Well Began Production
1982-06-01 Well Fluid changed to Gas
1982-06-01 Well Mode changed to Flowing
1983-10-20 Well Log Performed
1983-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-10-21 Well Fluid changed to Gas
1983-10-21 Well Mode changed to Flowing
1984-10-01 Well Fluid changed to Gas
1984-10-01 Well Mode changed to Suspended
1999-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-03 Plug Back Performed
1999-09-13 Well Abandoned
1999-09-13 Well Fluid changed to Gas
1999-09-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-03 Perforation 806.00 808.00 13
1981-11-03 Perforation 776.00 777.50 13
1981-11-05 Perforation 762.00 764.00 13
1983-10-21 Packing Device Capped w/Cement 792.00 800.00 0
1999-08-03 Packing Device Capped w/Cement 747.00 755.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 314 0.0 0.0 0.0
1983 895 0.0 0.0 0.0
1984 5515 0.0 0.0 0.0
1985 4 0.0 0.0 0.0

For data sources see[5]

References