X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554143602000

Well Details

Well ID: 0554143602000
Loading map...
Location: 00/02-36-055-14W4/0
Location Alias: 00/02-36-55-14 W4M
Location Alias 2: 00/02-36-055-14 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 14
Section: 36
County/Municipality: County of Two Hills No. 21
Well Name: BRASCAN HAIRY 2-36-55-14
Operator Name: Nyrstar Myra Falls Ltd.
License Number: 0073981
License Date: 1979-01-16
License Status: RecCertified
Spud Date: 1979-02-05
Final Drill Date: 1979-02-13
Well Total Depth: 680.00 m
Surface Hole Latitude: 53.790585
Surface Hole Longitude: -111.947504

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-16 Obtained License
1979-02-12 Lost Circulation Occurred
1979-02-13 Finished Drilling
1979-02-14 Production Casing Operation Performed
1979-02-14 Well Mode changed to Drilled and Cased
1979-03-12 Perforation Treatment Performed - Jet Perforation
1979-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-03 Perforation Treatment Performed - Jet Perforation
1979-07-03 Well Mode changed to Drilled and Cased
1980-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-11-03 Well Mode changed to Abandoned Zone
1980-11-04 Perforation Treatment Performed - Jet Perforation
1982-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-08-08 Perforation Treatment Performed - Jet Perforation
1982-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-08-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-03-12 Perforation 643.00 645.00 7
1980-11-04 Perforation 535.00 538.00 14
1982-08-08 Packing Device Capped w/Cement 542.00 550.00 0
1982-08-08 Packing Device Capped w/Cement 517.00 525.00 0
1982-08-08 Perforation 486.50 489.00 13
1982-08-09 Acid Treatment 486.50 489.00 0
1982-08-10 Packing Device Capped w/Cement 475.00 483.00 0
1979-03-12 Perforation 656.00 657.50 7
1979-03-12 Perforation 658.50 662.50 7
1979-03-15 Acid Treatment 656.00 662.50 0
1979-05-31 Acid Treatment 643.00 645.00 0
1979-07-03 Perforation 567.00 568.50 7
1980-11-03 Packing Device Capped w/Cement 645.00 650.00 0
1980-11-03 Packing Device Capped w/Cement 630.00 635.00 0
1980-11-04 Perforation 525.50 535.50 7

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-02-12 Lost Circulation 627.00 650.00

For data sources see[5]

References