X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554133115000

Well Details

Well ID: 0554133115000
Loading map...
Location: 00/15-31-055-13W4/0
Location Alias: 00/15-31-55-13 W4M
Location Alias 2: 00/15-31-055-13 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 13
Section: 31
County/Municipality: County of Two Hills No. 21
Well Name: NORWEST HAIRY 15-31-55-13
Operator Name: Canadian Natural Resources Limited
License Number: 0090282
License Date: 1981-05-22
License Status: RecCertified
Spud Date: 1981-06-02
Final Drill Date: 1981-06-05
Well Total Depth: 720.00 m
Surface Hole Latitude: 53.799362
Surface Hole Longitude: -111.917846

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-05-22 Obtained License
1981-06-05 Finished Drilling
1981-06-05 Well Mode changed to Drilled and Cased
1981-06-06 Drill Stem Test Performed
1981-06-07 Drill Stem Test Performed
1981-06-07 Production Casing Operation Performed
1981-07-01 Perforation Treatment Performed - Jet Perforation
1981-07-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-07-06 Perforation Treatment Performed - Jet Perforation
1981-09-02 Well Began Production
1981-09-02 Well Fluid changed to Crude Oil
1981-09-02 Well Mode changed to Pumping
1981-11-05 Well Fluid changed to Crude Oil
1981-11-05 Well Mode changed to Suspended
1991-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-05 Perforation Treatment Performed - Jet Perforation
1991-09-05 Plug Back Performed
1991-09-05 Well Fluid changed to Crude Oil
1991-09-05 Well Mode changed to Abandoned
1991-09-06 Perforation Treatment Performed - Cement Plug
1991-09-06 Perforation Treatment Performed - Remedial Casing
1991-10-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-01 Perforation 620.00 620.50 13
1981-07-02 Packing Device Capped w/Cement 606.00 614.00 0
1981-07-06 Perforation 539.00 540.50 13
1991-09-05 Packing Device Capped w/Cement 524.00 532.00 0
1991-09-05 Perforation 415.50 417.00 13
1991-09-06 Remedial Casing Cementing 415.50 417.00 0
1991-09-06 Cement Plug 277.00 417.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 744 0.0 0.0 0.0

For data sources see[5]

References