X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554092610003

Well Details

Well ID: 0554092610003
Loading map...
Location: 00/10-26-055-09W4/3
Location Alias: 00/10-26-55-09 W4M
Location Alias 2: 00/10-26-055-09 W4/03
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 09
Section: 26
County/Municipality: County of St. Paul No. 19
Well Name: CNRES CANARD 10-26-55-9
Operator Name: Canadian Natural Resources Limited
License Number: 0296430
License Date: 2003-11-19
License Status: Suspension
Spud Date: 2003-11-22
Final Drill Date: 2003-11-24
Well Total Depth: 712.00 m
Surface Hole Latitude: 53.782162
Surface Hole Longitude: -111.224530

For data sources see[1][2]

Well History

Date Event
2003-11-19 Obtained License
2003-11-22 Surface Casing Operation Performed
2003-11-23 Direction Drilling Operation Performed - Deviate
2003-11-24 Finished Drilling
2003-11-24 Well Log Performed
2003-11-24 Well Mode changed to Drilled and Cased
2003-11-25 Production Casing Operation Performed
2003-11-25 Rig Released
2003-12-06 Well Log Performed
2003-12-07 Perforation Treatment Performed - Jet Perforation
2006-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-06-14 Plug Back Performed
2006-06-14 Well Log Performed
2006-06-15 Perforation Treatment Performed - Jet Perforation
2006-06-15 Well Began Production
2006-06-15 Well Fluid changed to Gas
2006-06-15 Well Log Performed
2006-06-15 Well Mode changed to Flowing
2008-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-09 Plug Back Performed
2008-09-09 Well Fluid changed to Gas
2008-09-09 Well Mode changed to Abandoned Zone
2008-09-10 Perforation Treatment Performed - Jet Perforation
2008-09-10 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-11-23 134.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-12-07 Perforation 542.80 543.50 17
2003-12-07 Perforation 495.00 495.50 17
2006-06-14 Packing Device Capped w/Cement 532.00 540.00 0
2006-06-15 Perforation 521.00 523.00 17
2008-09-09 Packing Device Capped w/Cement 512.00 520.00 0
2008-09-10 Perforation 446.50 448.00 17
2008-09-10 Perforation 455.00 458.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1675 0.0 0.0 0.0

For data sources see[6]

References