X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554062906002

Well Details

Well ID: 0554062906002
Loading map...
Location: 00/06-29-055-06W4/2
Location Alias: 00/06-29-55-06 W4M
Location Alias 2: 00/06-29-055-06 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 06
Section: 29
County/Municipality: County of St. Paul No. 19
Well Name: AMOCO B2 LINDBERGH 6-29-55-6
Operator Name: Canadian Natural Resources Limited
License Number: 0101140
License Date: 1983-04-11
License Status: Suspension
Spud Date: 1983-05-19
Final Drill Date: 1983-05-23
Well Total Depth: 709.00 m
Surface Hole Latitude: 53.780109
Surface Hole Longitude: -110.862417

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-04-11 Obtained License
1983-05-23 Finished Drilling
1983-05-23 Well Mode changed to Drilled and Cased
1983-05-24 Production Casing Operation Performed
1983-05-24 Well Log Performed
1983-06-02 Perforation Treatment Performed - Jet Perforation
1987-03-24 Well Log Performed
2001-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-25 Perforation Treatment Performed - Cement Plug
2001-08-25 Plug Back Performed
2001-08-26 Perforation Treatment Performed - Jet Perforation
2001-08-26 Well Log Performed
2001-08-26 Well Mode changed to Drilled and Cased
2001-08-27 Well Began Production
2001-08-27 Well Fluid changed to Crude Bitumen
2001-08-27 Well Mode changed to Pumping
2002-11-30 Well Fluid changed to Crude Bitumen
2002-11-30 Well Mode changed to Suspended
2004-06-01 Well Fluid changed to Crude Bitumen
2004-06-01 Well Mode changed to Pumping
2004-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-06-18 Perforation Treatment Performed - Jet Perforation
2006-02-01 Well Fluid changed to Crude Bitumen
2006-02-01 Well Mode changed to Suspended
2014-11-08 Perforation Treatment Performed - Cement Plug
2014-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-06-02 Perforation 634.50 640.50 13
2014-11-09 Packing Device Capped w/Cement 532.00 540.00 0
1983-06-02 Perforation 641.50 643.50 13
1983-06-02 Perforation 644.50 646.50 13
2001-08-25 Cement Plug 648.00 682.90 0
2001-08-25 Packing Device Capped w/Cement 617.00 625.00 0
2001-08-26 Perforation 579.00 583.00 26
2004-06-17 Packing Device Capped w/Cement 562.80 570.80 0
2004-06-18 Perforation 543.50 546.50 26
2014-11-08 Cement Plug 546.50 570.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1501 0.0 0.0 0.0
2004 792 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References