X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554061903002

Well Details

Well ID: 0554061903002
Loading map...
Location: 00/03-19-055-06W4/2
Location Alias: 00/03-19-55-06 W4M
Location Alias 2: 00/03-19-055-06 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 06
Section: 19
County/Municipality: County of Two Hills No. 21
Well Name: PVR 3C LINDBERGH 3-19-55-6
Operator Name: Canadian Natural Resources Limited
License Number: 0206808
License Date: 1997-10-02
License Status: Issued
Spud Date: 1997-10-14
Final Drill Date: 1997-10-17
Well Total Depth: 618.00 m
Surface Hole Latitude: 53.762243
Surface Hole Longitude: -110.888936

For data sources see[1][2]

Well History

Date Event
1997-10-02 Obtained License
1997-10-15 Surface Casing Operation Performed
1997-10-17 Finished Drilling
1997-10-17 Well Log Performed
1997-10-17 Well Mode changed to Drilled and Cased
1997-10-18 Production Casing Operation Performed
1997-10-18 Rig Released
1997-11-05 Well Log Performed
1997-11-06 Perforation Treatment Performed - Jet Perforation
2002-04-11 Perforation Treatment Performed - Chemical Squeeze
2003-01-23 Perforation Treatment Performed - Chemical Squeeze
2003-01-28 Perforation Treatment Performed - Chemical Squeeze
2003-07-31 Perforation Treatment Performed - Chemical Squeeze
2018-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-21 Plug Back Performed
2018-03-22 Perforation Treatment Performed - Jet Perforation
2018-03-22 Well Began Production
2018-03-22 Well Fluid changed to Crude Bitumen
2018-03-22 Well Log Performed
2018-03-22 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-06 Perforation 584.00 588.00 26
2002-04-11 Chemical Squeeze 584.00 588.00 0
2003-01-23 Chemical Squeeze 584.00 588.00 0
2003-01-28 Chemical Squeeze 584.00 588.00 0
2003-07-31 Chemical Squeeze 584.00 588.00 0
2018-03-21 Packing Device Capped w/Cement 472.30 480.30 0
2018-03-22 Perforation 459.00 461.50 26
2018-03-22 Perforation 463.00 466.50 26
2018-03-22 Perforation 470.50 472.50 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6576 0.0 0.0 0.0
2019 8393 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References