X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554061404020

Well Details

Well ID: 0554061404020
Loading map...
Location: 02/04-14-055-06W4/0
Location Alias: 02/04-14-55-06 W4M
Location Alias 2: 02/04-14-055-06 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 06
Section: 14
County/Municipality: County of Vermilion River
Well Name: ELAN ET AL 4C LINDBERGH 4-14-55-6
Operator Name: Canadian Natural Resources Limited
License Number: 0186927
License Date: 1996-03-21
License Status: Suspension
Spud Date: 1996-04-02
Final Drill Date: 1996-04-04
Well Total Depth: 719.00 m
Surface Hole Latitude: 53.744901
Surface Hole Longitude: -110.794148

For data sources see[1][2]

Well History

Date Event
1996-03-21 Obtained License
1996-04-02 Surface Casing Operation Performed
1996-04-03 Direction Drilling Operation Performed - Deviate
1996-04-03 Well Log Performed
1996-04-04 Finished Drilling
1996-04-04 Well Log Performed
1996-04-04 Well Mode changed to Drilled and Cased
1996-04-05 Production Casing Operation Performed
1996-04-05 Rig Released
1996-04-08 Well Log Performed
1996-04-10 Perforation Treatment Performed - Jet Perforation
1996-04-10 Well Log Performed
1996-04-18 Well Began Production
1996-04-18 Well Fluid changed to Crude Bitumen
1996-04-18 Well Mode changed to Pumping
1996-11-30 Perforation Treatment Performed - Jet Perforation
1996-11-30 Well Log Performed
1998-09-30 Well Fluid changed to Crude Bitumen
1998-09-30 Well Mode changed to Suspended
2000-05-07 Well Fluid changed to Crude Bitumen
2000-05-07 Well Mode changed to Pumping
2002-01-01 Well Fluid changed to Crude Bitumen
2002-01-01 Well Mode changed to Suspended
2005-03-01 Well Fluid changed to Crude Bitumen
2005-03-01 Well Mode changed to Pumping
2005-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-03 Perforation Treatment Performed - Jet Perforation
2005-03-03 Plug Back Performed
2005-03-03 Well Fluid changed to Crude Bitumen
2005-03-03 Well Mode changed to Abandoned Zone
2005-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-12-08 Perforation Treatment Performed - Jet Perforation
2006-12-04 Perforation Treatment Performed - Cement Plug
2006-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-05 Perforation Treatment Performed - Jet Perforation
2006-12-05 Plug Back Performed
2006-12-05 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-04-03 52.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-04-10 Perforation 679.00 680.50 26
2006-12-05 Packing Device Capped w/Cement 560.20 570.20 0
2006-12-05 Perforation 529.50 530.50 26
2006-12-05 Perforation 532.00 533.00 26
2006-12-05 Perforation 536.50 537.50 26
1996-04-10 Perforation 683.00 684.00 26
1996-11-30 Perforation 661.00 665.50 26
1996-11-30 Perforation 667.00 674.00 26
2005-03-03 Packing Device Capped w/Cement 644.00 659.00 0
2005-03-03 Perforation 590.00 592.00 26
2005-12-07 Packing Device Capped w/Cement 583.00 585.00 0
2005-12-08 Perforation 576.00 578.00 26
2006-12-04 Cement Plug 578.00 583.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3950 0.0 0.0 0.0
1997 4559 0.0 0.0 0.0
1998 2135 0.0 0.0 0.0
2000 3408 0.0 0.0 0.0

For data sources see[6]

References