If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0554061302A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.744881,"lon":-110.754614,"icon":""}]} |
| Location: A0/02-13-055-06W4/0 | |
| Location Alias: A0/02-13-55-06 W4M | |
| Location Alias 2: A0/02-13-055-06 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 055 | |
| Meridian: 4 | |
| Range: 06 | |
| Section: 13 | |
| County/Municipality: County of Vermilion River | |
| Well Name: NORWEST LINDBERGH EX 2A-13-55-6 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0095928 | |
| License Date: 1982-05-18 | |
| License Status: Abandoned | |
| Spud Date: 1982-05-28 | |
| Final Drill Date: 1982-05-31 | |
| Well Total Depth: 632.00 m | |
| Surface Hole Latitude: 53.744881 | |
| Surface Hole Longitude: -110.754614 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1982-05-18 | Obtained License |
| 1982-05-31 | Finished Drilling |
| 1982-06-01 | Production Casing Operation Performed |
| 1982-06-02 | Well Mode changed to Drilled and Cased |
| 1982-06-03 | Well Log Performed |
| 1982-06-23 | Perforation Treatment Performed - Jet Perforation |
| 1982-08-01 | Well Began Production |
| 1982-08-01 | Well Fluid changed to Crude Bitumen |
| 1982-08-01 | Well Type changed to Cyclical |
| 1983-12-06 | Perforation Treatment Performed - Jet Perforation |
| 1983-12-06 | Well Log Performed |
| 1985-05-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1985-05-13 | Perforation Treatment Performed - Jet Perforation |
| 1985-05-13 | Plug Back Performed |
| 1985-05-13 | Well Log Performed |
| 1988-10-18 | Perforation Treatment Performed - Cement Squeeze |
| 1988-10-25 | Perforation Treatment Performed - Jet Perforation |
| 1992-10-15 | Well Fluid changed to Crude Bitumen |
| 1992-10-15 | Well Mode changed to Suspended |
| 1992-10-15 | Well Type changed to Cyclical |
| 2001-08-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-08-22 | Plug Back Performed |
| 2001-08-22 | Well Fluid changed to Crude Bitumen |
| 2001-08-22 | Well Mode changed to Abandoned Zone |
| 2001-08-22 | Well Type changed to Cyclical |
| 2001-08-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-08-23 | Plug Back Performed |
| 2006-09-09 | Well Log Performed |
| 2006-09-22 | Perforation Treatment Performed - Jet Perforation |
| 2006-09-22 | Well Log Performed |
| 2006-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-09-23 | Perforation Treatment Performed - Remedial Casing |
| 2006-10-23 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1982-06-23 | Perforation | 588.00 | 592.50 | 13 |
| 2006-09-22 | Perforation | 239.00 | 242.00 | 13 |
| 2006-09-22 | Perforation | 303.00 | 306.00 | 13 |
| 2006-09-23 | Remedial Casing Cementing | 303.00 | 306.00 | 0 |
| 2006-09-23 | Remedial Casing Cementing | 239.00 | 242.00 | 0 |
| 2006-09-23 | Packing Device Capped w/Cement | 190.80 | 300.00 | 0 |
| 1982-06-23 | Perforation | 596.00 | 599.00 | 13 |
| 1983-12-06 | Perforation | 596.00 | 599.00 | 19 |
| 1985-05-13 | Packing Device Capped w/Cement | 482.00 | 485.00 | 0 |
| 1985-05-13 | Perforation | 465.30 | 468.80 | 39 |
| 1988-10-18 | Cement Squeeze | 465.00 | 468.80 | 0 |
| 1988-10-25 | Perforation | 588.00 | 599.00 | 13 |
| 2001-08-22 | Packing Device Capped w/Cement | 570.00 | 578.00 | 0 |
| 2001-08-23 | Packing Device Capped w/Cement | 441.00 | 453.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1982 | 3672 | 0.0 | 0.0 | 0.0 |
| 1983 | 6891 | 0.0 | 0.0 | 0.0 |
| 1984 | 8225 | 0.0 | 0.0 | 0.0 |
| 1985 | 3527 | 0.0 | 0.0 | 0.0 |
| 1988 | 0 | 0.0 | 0.0 | 0.0 |
| 1989 | 6497 | 0.0 | 0.0 | 0.0 |
| 1990 | 8749 | 0.0 | 0.0 | 0.0 |
| 1991 | 5974 | 0.0 | 0.0 | 0.0 |
| 1992 | 1704 | 0.0 | 0.0 | 0.0 |
| 1995 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]