If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0554061301AA2 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.747476,"lon":-110.751635,"icon":""}]} |
| Location: AA/01-13-055-06W4/2 | |
| Location Alias: AA/01-13-55-06 W4M | |
| Location Alias 2: AA/01-13-055-06 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 055 | |
| Meridian: 4 | |
| Range: 06 | |
| Section: 13 | |
| County/Municipality: County of Vermilion River | |
| Well Name: NORWEST LINDBERGH EX 1C-13-55-6 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0107476 | |
| License Date: 1984-06-06 | |
| License Status: Suspension | |
| Spud Date: 1984-07-01 | |
| Final Drill Date: 1984-07-05 | |
| Well Total Depth: 642.00 m | |
| Surface Hole Latitude: 53.747476 | |
| Surface Hole Longitude: -110.751635 |
| Date | Event |
|---|---|
| 1984-05-07 | Well Log Performed |
| 1984-06-06 | Obtained License |
| 1984-07-02 | Surface Casing Operation Performed |
| 1984-07-03 | Direction Drilling Operation Performed - Deviate |
| 1984-07-05 | Finished Drilling |
| 1984-07-05 | Well Mode changed to Drilled and Cased |
| 1984-07-06 | Production Casing Operation Performed |
| 1984-07-06 | Rig Released |
| 1984-07-07 | Well Log Performed |
| 1984-07-31 | Well Log Performed |
| 1984-08-27 | Perforation Treatment Performed - Jet Perforation |
| 1984-08-27 | Well Log Performed |
| 1984-09-08 | Well Log Performed |
| 1986-06-25 | Well Log Performed |
| 1999-11-29 | Well Log Performed |
| 1999-11-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-11-30 | Perforation Treatment Performed - Cement Plug |
| 1999-11-30 | Perforation Treatment Performed - Jet Perforation |
| 1999-11-30 | Plug Back Performed |
| 1999-11-30 | Well Began Production |
| 1999-11-30 | Well Fluid changed to Crude Bitumen |
| 1999-11-30 | Well Mode changed to Pumping |
| 2002-01-15 | Well Fluid changed to Crude Bitumen |
| 2002-01-15 | Well Mode changed to Suspended |
| 2005-01-01 | Well Fluid changed to Crude Bitumen |
| 2005-01-01 | Well Mode changed to Pumping |
| 2006-03-31 | Well Fluid changed to Crude Bitumen |
| 2006-03-31 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1984-07-03 | 246.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-08-27 | Perforation | 594.00 | 599.50 | 39 |
| 1984-08-27 | Perforation | 601.50 | 606.00 | 39 |
| 1999-11-30 | Cement Plug | 610.00 | 636.00 | 0 |
| 1999-11-30 | Packing Device Capped w/Cement | 571.90 | 579.90 | 0 |
| 1999-11-30 | Perforation | 471.50 | 474.20 | 26 |
| 1999-11-30 | Perforation | 466.00 | 469.50 | 26 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1999 | 744 | 0.0 | 0.0 | 0.0 |
| 2000 | 8269 | 0.0 | 0.0 | 0.0 |
| 2001 | 5351 | 0.0 | 0.0 | 0.0 |
| 2005 | 1911 | 0.0 | 0.0 | 0.0 |
For data sources see[6]