X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554061210032

Well Details

Well ID: 0554061210032
Loading map...
Location: 03/10-12-055-06W4/2
Location Alias: 03/10-12-55-06 W4M
Location Alias 2: 03/10-12-055-06 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 06
Section: 12
County/Municipality: County of Vermilion River
Well Name: ELAN ET AL 10C LINDBERGH 10-12-55-6
Operator Name: Canadian Natural Resources Limited
License Number: 0193574
License Date: 1996-11-15
License Status: Suspension
Spud Date: 1996-11-25
Final Drill Date: 1996-11-27
Well Total Depth: 655.00 m
Surface Hole Latitude: 53.739593
Surface Hole Longitude: -110.756109

For data sources see[1][2]

Well History

Date Event
1996-11-15 Obtained License
1996-11-25 Surface Casing Operation Performed
1996-11-26 Direction Drilling Operation Performed - Deviate
1996-11-27 Finished Drilling
1996-11-27 Well Mode changed to Drilled and Cased
1996-11-28 Production Casing Operation Performed
1996-11-28 Rig Released
1996-11-28 Well Log Performed
1996-12-06 Perforation Treatment Performed - Jet Perforation
1996-12-06 Well Log Performed
1997-04-17 Well Log Performed
2000-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-17 Plug Back Performed
2000-05-18 Perforation Treatment Performed - Jet Perforation
2000-05-18 Well Mode changed to Drilled and Cased
2000-06-01 Well Began Production
2000-06-01 Well Fluid changed to Crude Bitumen
2000-06-01 Well Mode changed to Pumping
2008-04-30 Well Fluid changed to Crude Bitumen
2008-04-30 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-11-26 78.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-06 Perforation 613.00 617.00 26
1996-12-06 Perforation 621.00 627.00 26
2000-05-17 Packing Device Capped w/Cement 501.10 605.00 0
2000-05-18 Perforation 484.00 488.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6228 0.0 0.0 0.0
2001 6315 0.0 0.0 0.0
2002 6663 0.0 0.0 0.0
2003 7888 0.0 0.0 0.0
2004 8415 0.0 0.0 0.0
2005 7864 0.0 0.0 0.0
2006 6198 0.0 0.0 0.0
2007 6743 0.0 0.0 0.0

For data sources see[6]

References