X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554052208003

Well Details

Well ID: 0554052208003
Loading map...
Location: 00/08-22-055-05W4/3
Location Alias: 00/08-22-55-05 W4M
Location Alias 2: 00/08-22-055-05 W4/03
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 22
County/Municipality: County of Vermilion River
Well Name: ELAN ET AL 8A LINDBERGH 8-22-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0183794
License Date: 1995-12-20
License Status: Suspension
Spud Date: 1996-01-16
Final Drill Date: 1996-01-17
Well Total Depth: 577.00 m
Surface Hole Latitude: 53.763297
Surface Hole Longitude: -110.650485

For data sources see[1][2]

Well History

Date Event
1995-12-20 Obtained License
1996-01-17 Finished Drilling
1996-01-17 Well Log Performed
1996-01-17 Well Mode changed to Drilled and Cased
1996-01-18 Production Casing Operation Performed
1996-01-18 Rig Released
1996-01-27 Perforation Treatment Performed - Jet Perforation
2003-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-24 Perforation Treatment Performed - Jet Perforation
2003-06-24 Plug Back Performed
2005-07-09 Perforation Treatment Performed - Jet Perforation
2005-07-09 Well Log Performed
2006-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-21 Perforation Treatment Performed - Jet Perforation
2006-11-21 Plug Back Performed
2006-11-30 Well Began Production
2006-11-30 Well Fluid changed to Crude Bitumen
2006-11-30 Well Mode changed to Pumping
2007-09-26 Well Log Performed
2008-04-28 Perforation Treatment Performed - Chemical Squeeze
2009-07-14 Perforation Treatment Performed - Jet Perforation
2012-09-30 Well Fluid changed to Crude Bitumen
2012-09-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-01-27 Perforation 565.00 570.00 26
2006-11-21 Packing Device Capped w/Cement 460.00 470.00 0
2006-11-21 Perforation 439.50 442.00 26
2006-11-21 Perforation 444.00 446.00 26
2008-04-28 Chemical Squeeze 439.50 446.00 0
2009-07-14 Perforation 439.50 442.00 13
2009-07-14 Perforation 444.00 446.00 13
2003-06-24 Packing Device Capped w/Cement 543.00 551.00 0
2003-06-24 Perforation 485.00 487.00 26
2005-07-09 Perforation 476.00 477.00 26
2005-07-09 Perforation 481.00 483.00 26
2005-07-09 Perforation 489.00 493.50 26
2005-07-09 Perforation 497.00 500.50 26
2006-11-20 Packing Device Capped w/Cement 493.50 496.00 0
2006-11-21 Packing Device Capped w/Cement 487.00 488.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 948 0.0 0.0 0.0
2007 7928 0.0 0.0 0.0
2008 5738 0.0 0.0 0.0
2009 4115 0.0 0.0 0.0
2010 7742 0.0 0.0 0.0
2011 2000 0.0 0.0 0.0
2012 744 0.0 0.0 0.0

For data sources see[5]

References