X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554052206032

Well Details

Well ID: 0554052206032
Loading map...
Location: 03/06-22-055-05W4/2
Location Alias: 03/06-22-55-05 W4M
Location Alias 2: 03/06-22-055-05 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 22
County/Municipality: County of Vermilion River
Well Name: ELAN ET AL 6A LINDBERGH 6-22-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0189571
License Date: 1996-07-12
License Status: Abandoned
Spud Date: 1996-08-01
Final Drill Date: 1996-08-04
Well Total Depth: 581.00 m
Surface Hole Latitude: 53.762521
Surface Hole Longitude: -110.666375

For data sources see[1][2]

Well History

Date Event
1996-07-12 Obtained License
1996-08-01 Lost Circulation Occurred
1996-08-01 Surface Casing Operation Performed
1996-08-02 Direction Drilling Operation Performed - Deviate
1996-08-02 Lost Circulation Occurred
1996-08-04 Finished Drilling
1996-08-04 Production Casing Operation Performed
1996-08-04 Rig Released
1996-08-04 Well Log Performed
1996-08-04 Well Mode changed to Drilled and Cased
1996-08-08 Perforation Treatment Performed - Jet Perforation
1996-08-08 Well Log Performed
1996-08-09 Well Log Performed
1996-10-01 Well Log Performed
1996-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-27 Plug Back Performed
1996-11-28 Perforation Treatment Performed - Jet Perforation
1996-11-28 Well Log Performed
1996-12-01 Well Began Production
1996-12-01 Well Fluid changed to Crude Bitumen
1996-12-01 Well Mode changed to Pumping
1997-01-22 Well Log Performed
1998-09-30 Well Fluid changed to Crude Bitumen
1998-09-30 Well Mode changed to Suspended
2003-03-01 Well Fluid changed to Crude Bitumen
2003-03-01 Well Mode changed to Pumping
2003-03-22 Perforation Treatment Performed - Cement Plug
2003-03-23 Perforation Treatment Performed - Jet Perforation
2004-03-10 Perforation Treatment Performed - Cement Plug
2004-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-03-11 Perforation Treatment Performed - Jet Perforation
2004-03-11 Plug Back Performed
2004-03-11 Well Fluid changed to Crude Bitumen
2004-03-11 Well Log Performed
2004-03-11 Well Mode changed to Abandoned Zone
2014-06-16 Perforation Treatment Performed - Cement Plug
2014-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-06-17 Plug Back Performed
2014-06-19 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-08-02 71.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-08 Perforation 569.00 573.50 26
2014-06-16 Cement Plug 415.00 436.70 0
2014-06-17 Packing Device Capped w/Cement 380.00 400.00 0
1996-11-27 Packing Device Capped w/Cement 547.00 555.00 0
1996-11-28 Perforation 479.00 481.00 26
2003-03-22 Cement Plug 482.00 547.00 0
2003-03-23 Perforation 459.50 461.50 26
2004-03-10 Cement Plug 462.30 482.00 0
2004-03-11 Packing Device Capped w/Cement 436.70 444.70 0
2004-03-11 Perforation 411.00 413.00 26
2004-03-11 Perforation 414.50 415.80 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 500 0.0 0.0 0.0
1997 7350 0.0 0.0 0.0
1998 336 0.0 0.0 0.0
2003 1440 0.0 0.0 0.0
2004 755 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-08-01 Lost Circulation 45.00 71.00
1996-08-02 Lost Circulation 71.00 103.00
2014-06-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References