X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554052205022

Well Details

Well ID: 0554052205022
Loading map...
Location: 02/05-22-055-05W4/2
Location Alias: 02/05-22-55-05 W4M
Location Alias 2: 02/05-22-055-05 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 22
County/Municipality: County of Vermilion River
Well Name: ELAN ET AL 5C LINDBERGH 5-22-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0189218
License Date: 1996-07-03
License Status: Abandoned
Spud Date: 1996-07-15
Final Drill Date: 1996-07-17
Well Total Depth: 595.00 m
Surface Hole Latitude: 53.767080
Surface Hole Longitude: -110.668812

For data sources see[1][2]

Well History

Date Event
1996-07-03 Obtained License
1996-07-15 Surface Casing Operation Performed
1996-07-16 Direction Drilling Operation Performed - Deviate
1996-07-16 Well Log Performed
1996-07-17 Finished Drilling
1996-07-17 Well Log Performed
1996-07-17 Well Mode changed to Drilled and Cased
1996-07-18 Production Casing Operation Performed
1996-07-18 Rig Released
1996-07-28 Perforation Treatment Performed - Jet Perforation
1996-07-28 Well Log Performed
1996-10-16 Well Log Performed
1996-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-29 Perforation Treatment Performed - Jet Perforation
1996-11-29 Plug Back Performed
1996-11-29 Well Log Performed
1996-12-01 Well Began Production
1996-12-01 Well Fluid changed to Crude Bitumen
1996-12-01 Well Mode changed to Pumping
2000-04-30 Well Fluid changed to Crude Bitumen
2000-04-30 Well Mode changed to Suspended
2003-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-16 Perforation Treatment Performed - Jet Perforation
2003-10-16 Plug Back Performed
2003-10-16 Well Fluid changed to Crude Bitumen
2003-10-16 Well Log Performed
2003-10-16 Well Mode changed to Abandoned Zone
2012-07-11 Perforation Treatment Performed - Jet Perforation
2012-07-14 Perforation Treatment Performed - Jet Perforation
2012-07-15 Perforation Treatment Performed - Casing Patch (Over Perfs)
2012-07-16 Perforation Treatment Performed - Jet Perforation
2012-07-16 Well Fluid changed to Crude Bitumen
2012-07-16 Well Mode changed to Pumping
2013-03-31 Well Fluid changed to Crude Bitumen
2013-03-31 Well Mode changed to Suspended
2013-10-01 Well Fluid changed to Crude Bitumen
2013-10-01 Well Mode changed to Pumping
2014-04-30 Well Fluid changed to Crude Bitumen
2014-04-30 Well Mode changed to Suspended
2017-01-01 Well Fluid changed to Crude Bitumen
2017-01-01 Well Mode changed to Pumping
2017-02-01 Well Fluid changed to Crude Bitumen
2017-02-01 Well Mode changed to Suspended
2017-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-08-08 Plug Back Performed
2017-08-08 Well Fluid changed to Crude Bitumen
2017-08-08 Well Mode changed to Abandoned Zone
2018-02-07 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-07-16 79.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-28 Perforation 576.00 584.00 26
2012-07-11 Perforation 476.00 477.00 26
2012-07-11 Perforation 469.00 475.00 26
2012-07-11 Perforation 464.00 466.00 26
2012-07-14 Perforation 483.00 486.00 26
2012-07-15 Casing Patch 419.00 421.00 0
2012-07-16 Perforation 483.00 486.00 13
2012-07-16 Perforation 464.00 466.00 13
2012-07-16 Perforation 469.00 472.00 13
2012-07-16 Perforation 476.00 477.00 13
2017-08-08 Packing Device Capped w/Cement 472.00 482.00 0
1996-11-29 Packing Device Capped w/Cement 555.00 563.00 0
2017-08-08 Packing Device Capped w/Cement 444.00 454.00 0
2017-08-08 Packing Device Capped w/Cement 399.00 409.00 0
1996-11-29 Perforation 464.00 466.00 26
1996-11-29 Perforation 469.00 472.00 26
1996-11-29 Perforation 476.00 477.00 26
1996-11-29 Perforation 483.00 486.00 26
2003-10-15 Packing Device Capped w/Cement 477.00 482.00 0
2003-10-16 Packing Device Capped w/Cement 445.00 457.00 0
2003-10-16 Perforation 419.00 421.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 576 0.0 0.0 0.0
1997 8583 0.0 0.0 0.0
1998 8027 0.0 0.0 0.0
1999 8471 0.0 0.0 0.0
2012 623 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-15 No Incident Encountered 0.00 0.00
2012-07-15 No Incident Encountered 0.00 0.00
2017-08-08 No Incident Encountered 0.00 0.00

For data sources see[7]

References