X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554052006032

Well Details

Well ID: 0554052006032
Loading map...
Location: 03/06-20-055-05W4/2
Location Alias: 03/06-20-55-05 W4M
Location Alias 2: 03/06-20-055-05 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 20
County/Municipality: County of Vermilion River
Well Name: ELAN ET AL 6A LINDBERGH 6-20-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0191245
License Date: 1996-09-12
License Status: Abandoned
Spud Date: 1996-09-19
Final Drill Date: 1996-09-21
Well Total Depth: 672.00 m
Surface Hole Latitude: 53.763623
Surface Hole Longitude: -110.715291

For data sources see[1][2]

Well History

Date Event
1996-09-12 Obtained License
1996-09-19 Surface Casing Operation Performed
1996-09-20 Direction Drilling Operation Performed - Deviate
1996-09-21 Finished Drilling
1996-09-21 Well Mode changed to Drilled and Cased
1996-09-22 Production Casing Operation Performed
1996-09-22 Rig Released
1996-09-22 Well Log Performed
1996-09-25 Perforation Treatment Performed - Jet Perforation
1996-09-25 Well Log Performed
1997-02-11 Well Log Performed
1997-12-12 Well Log Performed
2003-03-01 Well Began Production
2003-03-01 Well Fluid changed to Crude Bitumen
2003-03-01 Well Mode changed to Pumping
2003-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-17 Perforation Treatment Performed - Jet Perforation
2003-03-17 Plug Back Performed
2003-03-17 Well Log Performed
2003-07-07 Perforation Treatment Performed - Jet Perforation
2003-07-07 Well Log Performed
2005-12-01 Well Fluid changed to Crude Bitumen
2005-12-01 Well Mode changed to Suspended
2010-01-01 Well Fluid changed to Crude Bitumen
2010-01-01 Well Mode changed to Pumping
2010-01-27 Perforation Treatment Performed - Jet Perforation
2010-08-04 Perforation Treatment Performed - Cement Plug
2010-08-05 Perforation Treatment Performed - Jet Perforation
2010-08-05 Well Log Performed
2011-03-31 Well Fluid changed to Crude Bitumen
2011-03-31 Well Mode changed to Suspended
2017-01-01 Well Fluid changed to Crude Bitumen
2017-01-01 Well Mode changed to Pumping
2017-02-01 Well Fluid changed to Crude Bitumen
2017-02-01 Well Mode changed to Suspended
2017-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-06-01 Plug Back Performed
2017-06-01 Well Fluid changed to Crude Bitumen
2017-06-01 Well Mode changed to Abandoned Zone
2017-12-20 Well Abandoned
2017-12-20 Well Fluid changed to Crude Bitumen
2017-12-20 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-09-20 69.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-09-25 Perforation 634.00 637.00 26
2017-06-01 Packing Device Capped w/Cement 521.00 531.00 0
1996-09-25 Perforation 640.50 648.00 26
2003-03-17 Packing Device Capped w/Cement 624.00 632.00 0
2003-03-17 Perforation 546.50 548.00 26
2003-07-07 Perforation 548.00 549.00 26
2010-01-27 Perforation 546.50 549.00 13
2010-01-27 Perforation 549.00 552.00 26
2010-08-04 Cement Plug 552.00 624.00 0
2010-08-05 Perforation 541.50 543.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 688 0.0 0.0 0.0
2010 3014 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-06-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References