X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554051904022

Well Details

Well ID: 0554051904022
Loading map...
Location: 02/04-19-055-05W4/2
Location Alias: 02/04-19-55-05 W4M
Location Alias 2: 02/04-19-055-05 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 19
County/Municipality: County of Vermilion River
Well Name: ELAN PCP 4C LINDBERGH 4-19-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0185239
License Date: 1996-02-01
License Status: Abandoned
Spud Date: 1996-02-05
Final Drill Date: 1996-02-08
Well Total Depth: 703.00 m
Surface Hole Latitude: 53.760031
Surface Hole Longitude: -110.743018

For data sources see[1][2]

Well History

Date Event
1996-02-01 Obtained License
1996-02-05 Surface Casing Operation Performed
1996-02-06 Direction Drilling Operation Performed - Deviate
1996-02-07 Well Log Performed
1996-02-08 Finished Drilling
1996-02-08 Well Log Performed
1996-02-08 Well Mode changed to Drilled and Cased
1996-02-09 Production Casing Operation Performed
1996-02-09 Rig Released
1996-02-21 Perforation Treatment Performed - Jet Perforation
1996-07-03 Perforation Treatment Performed - Jet Perforation
1996-07-03 Well Log Performed
1997-02-04 Perforation Treatment Performed - Jet Perforation
1997-02-04 Well Log Performed
1997-02-06 Well Began Production
1997-02-06 Well Fluid changed to Crude Bitumen
1997-02-06 Well Mode changed to Pumping
1998-09-30 Well Fluid changed to Crude Bitumen
1998-09-30 Well Mode changed to Suspended
2000-01-01 Well Fluid changed to Crude Bitumen
2000-01-01 Well Mode changed to Pumping
2002-01-01 Well Fluid changed to Crude Bitumen
2002-01-01 Well Mode changed to Suspended
2008-01-01 Well Fluid changed to Crude Bitumen
2008-01-01 Well Mode changed to Pumping
2008-01-04 Perforation Treatment Performed - Chemical Squeeze
2009-07-23 Perforation Treatment Performed - Jet Perforation
2010-06-30 Well Fluid changed to Crude Bitumen
2010-06-30 Well Mode changed to Suspended
2011-09-29 Perforation Treatment Performed - Cement Plug
2011-10-03 Perforation Treatment Performed - Cement Plug
2011-11-29 Perforation Treatment Performed - Cement Plug
2011-11-29 Plug Back Performed
2011-11-29 Well Fluid changed to Crude Bitumen
2011-11-29 Well Mode changed to Abandoned Zone
2011-11-30 Well Abandoned
2011-11-30 Well Fluid changed to Crude Bitumen
2011-11-30 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-02-06 39.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-21 Perforation 688.50 690.00 26
2009-07-23 Perforation 505.50 508.00 13
2011-09-29 Cement Plug 487.50 508.00 0
2011-10-03 Cement Plug 478.50 487.50 0
2011-11-29 Cement Plug 404.50 478.50 0
1996-02-21 Perforation 691.00 691.80 26
1996-02-21 Perforation 697.00 698.00 26
1996-07-03 Perforation 664.00 669.00 26
1996-07-03 Perforation 673.00 678.00 26
1997-02-04 Perforation 499.50 503.00 26
1997-02-04 Perforation 505.50 508.00 26
2008-01-04 Chemical Squeeze 499.50 508.00 0
2009-07-23 Perforation 499.50 503.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1953 0.0 0.0 0.0
2000 3536 0.0 0.0 0.0
2008 7907 0.0 0.0 0.0
2009 5373 0.0 0.0 0.0

For data sources see[6]

References