X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554051810AC2

Well Details

Well ID: 0554051810AC2
Loading map...
Location: AC/10-18-055-05W4/2
Location Alias: AC/10-18-55-05 W4M
Location Alias 2: AC/10-18-055-05 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 18
County/Municipality: County of Vermilion River
Well Name: AMOCO 10CX LIND EX 10C-18-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0092468
License Date: 1981-09-29
License Status: Suspension
Spud Date: 1981-10-17
Final Drill Date: 1981-10-19
Well Total Depth: 607.00 m
Surface Hole Latitude: 53.754256
Surface Hole Longitude: -110.735189

For data sources see[1][2]

Well History

Date Event
1981-09-29 Obtained License
1981-10-19 Finished Drilling
1981-10-19 Production Casing Operation Performed
1981-10-19 Well Log Performed
1981-10-19 Well Mode changed to Drilled and Cased
1981-10-29 Perforation Treatment Performed - Jet Perforation
1981-10-29 Well Log Performed
1995-08-23 Perforation Treatment Performed - Jet Perforation
1995-08-23 Well Log Performed
2010-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-25 Plug Back Performed
2010-05-26 Perforation Treatment Performed - Jet Perforation
2010-05-31 Well Began Production
2010-05-31 Well Fluid changed to Crude Bitumen
2010-05-31 Well Mode changed to Pumping
2012-02-01 Well Fluid changed to Crude Bitumen
2012-02-01 Well Mode changed to Suspended
2017-08-01 Well Fluid changed to Crude Bitumen
2017-08-01 Well Mode changed to Pumping
2018-05-31 Well Fluid changed to Crude Bitumen
2018-05-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-10-29 Perforation 581.00 585.00 13
1981-10-29 Perforation 588.00 593.00 13
1995-08-23 Perforation 581.00 585.00 13
1995-08-23 Perforation 588.00 593.00 13
2010-05-25 Packing Device Capped w/Cement 525.00 577.00 0
2010-05-26 Perforation 504.50 506.00 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4642 0.0 0.0 0.0
2011 2867 0.0 0.0 0.0

For data sources see[5]

References