X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554051810AA0

Well Details

Well ID: 0554051810AA0
Loading map...
Location: AA/10-18-055-05W4/0
Location Alias: AA/10-18-55-05 W4M
Location Alias 2: AA/10-18-055-05 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 18
County/Municipality: County of Vermilion River
Well Name: AMOCO 10A LIND EX 10A-18-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0092383
License Date: 1981-09-24
License Status: Abandoned
Spud Date: 1981-10-05
Final Drill Date: 1981-10-07
Well Total Depth: 605.00 m
Surface Hole Latitude: 53.752455
Surface Hole Longitude: -110.730650

For data sources see[1][2]

Well History

Date Event
1981-09-24 Obtained License
1981-10-07 Finished Drilling
1981-10-07 Production Casing Operation Performed
1981-10-07 Well Log Performed
1981-10-07 Well Mode changed to Drilled and Cased
1981-10-15 Perforation Treatment Performed - Jet Perforation
1981-10-15 Well Log Performed
1981-10-29 Well Began Production
1981-10-29 Well Fluid changed to Crude Bitumen
1981-10-29 Well Mode changed to Pumping
1986-10-27 Well Fluid changed to Crude Bitumen
1986-10-27 Well Mode changed to Suspended
1987-05-07 Well Fluid changed to Crude Bitumen
1987-05-07 Well Mode changed to Pumping
1988-03-03 Well Fluid changed to Crude Bitumen
1988-03-03 Well Mode changed to Suspended
1995-02-21 Perforation Treatment Performed - Abrasa-Jet Perforation
1995-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-21 Perforation Treatment Performed - Remedial Casing
1995-02-21 Plug Back Performed
1995-02-21 Well Fluid changed to Crude Bitumen
1995-02-21 Well Mode changed to Abandoned Zone
1999-08-08 Well Abandoned
1999-08-08 Well Fluid changed to Crude Bitumen
1999-08-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-10-15 Perforation 576.00 580.00 13
1981-10-15 Perforation 583.00 589.00 13
1995-02-21 Packing Device Capped w/Cement 431.00 565.00 0
1995-02-21 Hydra Jet Perforation 252.10 252.10 0
1995-02-21 Remedial Casing Cementing 252.10 252.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1239 0.0 0.0 0.0
1982 7845 0.0 0.0 0.0
1983 8166 0.0 0.0 0.0
1984 7178 0.0 0.0 0.0
1985 6096 0.0 0.0 0.0
1986 940 0.0 0.0 0.0
1987 1859 0.0 0.0 0.0
1988 746 0.0 0.0 0.0

For data sources see[5]

References