X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554051806AD0

Well Details

Well ID: 0554051806AD0
Loading map...
Location: AD/06-18-055-05W4/0
Location Alias: AD/06-18-55-05 W4M
Location Alias 2: AD/06-18-055-05 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 18
County/Municipality: County of Vermilion River
Well Name: AMOCO 6C2 LIND EX 6-18-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0092305
License Date: 1981-09-21
License Status: Suspension
Spud Date: 1981-09-24
Final Drill Date: 1981-09-26
Well Total Depth: 600.00 m
Surface Hole Latitude: 53.749938
Surface Hole Longitude: -110.739964

For data sources see[1][2]

Well History

Date Event
1981-09-21 Obtained License
1981-09-26 Finished Drilling
1981-09-26 Well Log Performed
1981-09-26 Well Mode changed to Drilled and Cased
1981-09-27 Production Casing Operation Performed
1981-10-06 Perforation Treatment Performed - Jet Perforation
1981-10-06 Well Log Performed
1981-10-08 Well Began Production
1981-10-08 Well Fluid changed to Crude Bitumen
1981-10-08 Well Mode changed to Pumping
1981-12-02 Well Log Performed
1983-02-09 Well Log Performed
1983-07-25 Well Fluid changed to Crude Bitumen
1983-07-25 Well Type changed to Cyclical
1985-11-15 Well Log Performed
1987-12-20 Well Fluid changed to Crude Bitumen
1987-12-20 Well Mode changed to Suspended
1987-12-20 Well Type changed to Cyclical
2000-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-26 Plug Back Performed
2000-06-26 Well Fluid changed to Crude Bitumen
2000-06-26 Well Mode changed to Abandoned Zone
2000-06-26 Well Type changed to Cyclical
2000-07-08 Well Log Performed
2000-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-13 Perforation Treatment Performed - Jet Perforation
2000-07-13 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-10-06 Perforation 584.00 589.00 13
2000-06-26 Packing Device Capped w/Cement 419.00 565.00 0
2000-07-13 Perforation 327.00 328.00 18
2000-07-13 Acid Treatment 327.00 328.00 0
2000-07-13 Remedial Casing Cementing 327.00 328.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1440 0.0 0.0 0.0
1982 5790 0.0 0.0 0.0
1983 5882 0.0 0.0 0.0
1984 4415 0.0 0.0 0.0
1985 6479 0.0 0.0 0.0
1986 6891 0.0 0.0 0.0
1987 6371 0.0 0.0 0.0

For data sources see[5]

References