X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554051802AB0

Well Details

Well ID: 0554051802AB0
Loading map...
Location: AB/02-18-055-05W4/0
Location Alias: AB/02-18-55-05 W4M
Location Alias 2: AB/02-18-055-05 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 05
Section: 18
County/Municipality: County of Vermilion River
Well Name: AMOCO 2B LIND EX 2B-18-55-5
Operator Name: Canadian Natural Resources Limited
License Number: 0092531
License Date: 1981-10-02
License Status: Suspension
Spud Date: 1981-10-22
Final Drill Date: 1981-10-23
Well Total Depth: 617.50 m
Surface Hole Latitude: 53.745213
Surface Hole Longitude: -110.733675

For data sources see[1][2]

Well History

Date Event
1981-10-02 Obtained License
1981-10-23 Finished Drilling
1981-10-23 Well Log Performed
1981-10-23 Well Mode changed to Drilled and Cased
1981-10-24 Production Casing Operation Performed
1981-11-03 Perforation Treatment Performed - Jet Perforation
1981-11-04 Well Log Performed
1981-11-20 Well Began Production
1981-11-20 Well Fluid changed to Crude Bitumen
1981-11-20 Well Mode changed to Pumping
1985-10-28 Well Log Performed
1986-10-27 Well Fluid changed to Crude Bitumen
1986-10-27 Well Mode changed to Suspended
1987-12-11 Well Fluid changed to Crude Bitumen
1987-12-11 Well Mode changed to Pumping
1988-01-31 Well Fluid changed to Crude Bitumen
1988-01-31 Well Mode changed to Suspended
1989-04-24 Well Fluid changed to Crude Bitumen
1989-04-24 Well Mode changed to Pumping
1991-04-01 Well Fluid changed to Crude Bitumen
1991-04-01 Well Mode changed to Suspended
1995-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-18 Perforation Treatment Performed - Jet Perforation
1995-01-18 Plug Back Performed
1995-01-18 Well Fluid changed to Crude Bitumen
1995-01-18 Well Mode changed to Abandoned Zone
2013-10-18 Perforation Treatment Performed - Cement Plug
2013-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-03 Perforation 582.00 585.50 13
1981-11-03 Perforation 589.50 594.50 13
1995-01-18 Packing Device Capped w/Cement 543.00 568.00 0
1995-01-18 Perforation 461.00 464.00 26
2013-10-18 Cement Plug 464.00 543.00 0
2013-10-19 Packing Device Capped w/Cement 430.00 450.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 744 0.0 0.0 0.0
1982 7771 0.0 0.0 0.0
1983 8627 0.0 0.0 0.0
1984 8279 0.0 0.0 0.0
1985 7199 0.0 0.0 0.0
1986 977 0.0 0.0 0.0
1987 465 0.0 0.0 0.0
1988 590 0.0 0.0 0.0
1989 332 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References