X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554043311000

Well Details

Well ID: 0554043311000
Loading map...
Location: 00/11-33-055-04W4/0
Location Alias: 00/11-33-55-04 W4M
Location Alias 2: 00/11-33-055-04 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 04
Section: 33
County/Municipality: County of St. Paul No. 19
Well Name: PVR 11B LINDBERGH 11-33-55-4
Operator Name: Canadian Natural Resources Limited
License Number: 0183579
License Date: 1995-12-15
License Status: Suspension
Spud Date: 1996-03-03
Final Drill Date: 1996-03-05
Well Total Depth: 668.00 m
Surface Hole Latitude: 53.797665
Surface Hole Longitude: -110.548223

For data sources see[1][2]

Well History

Date Event
1995-12-15 Obtained License
1996-03-03 Direction Drilling Operation Performed - Deviate
1996-03-03 Surface Casing Operation Performed
1996-03-03 Well Log Performed
1996-03-05 Finished Drilling
1996-03-05 Well Mode changed to Drilled and Cased
1996-03-06 Production Casing Operation Performed
1996-03-06 Rig Released
1996-03-06 Well Log Performed
1996-04-12 Well Log Performed
1996-04-13 Well Log Performed
1996-04-16 Well Log Performed
1996-05-24 Perforation Treatment Performed - Jet Perforation
1996-05-24 Well Log Performed
1996-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-01 Perforation Treatment Performed - Remedial Casing
1996-08-16 Well Log Performed
1996-08-28 Well Log Performed
1996-08-29 Perforation Treatment Performed - Jet Perforation
1996-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-31 Perforation Treatment Performed - Remedial Casing
1996-09-27 Perforation Treatment Performed - Jet Perforation
1996-09-27 Well Log Performed
1996-10-01 Well Began Production
1996-10-01 Well Fluid changed to Crude Bitumen
1996-10-01 Well Mode changed to Pumping
1997-01-06 Well Fluid changed to Crude Bitumen
1997-01-06 Well Mode changed to Suspended
2012-07-27 Well Log Performed
2012-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-09 Perforation Treatment Performed - Jet Perforation
2012-08-09 Plug Back Performed
2012-08-09 Well Fluid changed to Crude Bitumen
2012-08-09 Well Log Performed
2012-08-09 Well Mode changed to Abandoned Zone
2012-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-10 Perforation Treatment Performed - Remedial Casing
2012-08-11 Perforation Treatment Performed - Jet Perforation
2012-08-11 Well Log Performed
2012-08-12 Perforation Treatment Performed - Remedial Casing
2012-08-13 Perforation Treatment Performed - Jet Perforation
2012-08-13 Well Log Performed
2012-08-14 Perforation Treatment Performed - Remedial Casing
2013-08-19 Well Log Performed
2013-08-21 Perforation Treatment Performed - Cement Plug
2013-08-21 Perforation Treatment Performed - Jet Perforation
2013-08-21 Well Log Performed
2013-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-22 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-03-03 135.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-05-24 Perforation 484.50 485.50 13
2012-08-09 Packing Device Capped w/Cement 487.00 518.00 0
2012-08-09 Perforation 481.50 484.50 20
2012-08-10 Remedial Casing Cementing 481.50 484.50 0
2012-08-10 Packing Device Capped w/Cement 470.00 475.00 0
2012-08-11 Perforation 277.00 280.00 20
2012-08-12 Remedial Casing Cementing 277.00 280.00 0
2012-08-13 Perforation 141.00 144.00 20
2012-08-14 Remedial Casing Cementing 141.00 144.00 0
2013-08-21 Cement Plug 450.00 470.00 0
2013-08-21 Perforation 327.00 329.00 17
1996-06-01 Acid Treatment 484.50 485.50 0
2013-08-22 Remedial Casing Cementing 327.00 329.00 0
2013-08-22 Packing Device Capped w/Cement 297.00 323.00 0
2013-08-22 Packing Device Capped w/Cement 250.00 266.00 0
1996-06-01 Remedial Casing Cementing 484.50 485.50 0
1996-08-29 Perforation 269.00 270.00 7
1996-08-29 Perforation 277.00 278.00 7
1996-08-30 Acid Treatment 269.00 278.00 0
1996-08-31 Remedial Casing Cementing 269.00 278.00 0
1996-09-27 Perforation 572.00 576.00 30
1996-09-27 Perforation 582.50 586.50 30

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1448 0.0 0.0 0.0
1997 144 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-05 No Incident Encountered 0.00 0.00
2018-07-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References