X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554041915020

Well Details

Well ID: 0554041915020
Loading map...
Location: 02/15-19-055-04W4/0
Location Alias: 02/15-19-55-04 W4M
Location Alias 2: 02/15-19-055-04 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 04
Section: 19
County/Municipality: County of Vermilion River
Well Name: PVR 15D LINDBERGH 15-19-55-4
Operator Name: Canadian Natural Resources Limited
License Number: 0232576
License Date: 2000-01-25
License Status: Abandoned
Spud Date: 2000-03-30
Final Drill Date: 2000-04-01
Well Total Depth: 612.00 m
Surface Hole Latitude: 53.770307
Surface Hole Longitude: -110.581506

For data sources see[1][2]

Well History

Date Event
2000-01-25 Obtained License
2000-03-30 Direction Drilling Operation Performed - Deviate
2000-03-30 Surface Casing Operation Performed
2000-04-01 Finished Drilling
2000-04-02 Production Casing Operation Performed
2000-04-02 Rig Released
2000-04-02 Well Log Performed
2000-04-02 Well Mode changed to Drilled and Cased
2000-04-07 Well Log Performed
2000-04-12 Perforation Treatment Performed - Jet Perforation
2000-04-12 Well Log Performed
2000-04-13 Well Began Production
2000-04-13 Well Fluid changed to Crude Bitumen
2000-04-13 Well Log Performed
2000-04-13 Well Mode changed to Pumping
2000-06-22 Perforation Treatment Performed - Jet Perforation
2000-06-22 Well Log Performed
2000-06-23 Well Fluid changed to Crude Bitumen
2000-06-23 Well Mode changed to Pumping
2002-04-16 Perforation Treatment Performed - Chemical Squeeze
2002-04-23 Perforation Treatment Performed - Chemical Squeeze
2003-01-28 Perforation Treatment Performed - Chemical Squeeze
2003-01-29 Perforation Treatment Performed - Chemical Squeeze
2003-01-31 Perforation Treatment Performed - Chemical Squeeze
2003-02-04 Perforation Treatment Performed - Chemical Squeeze
2003-02-10 Perforation Treatment Performed - Chemical Squeeze
2003-02-14 Perforation Treatment Performed - Chemical Squeeze
2003-02-15 Perforation Treatment Performed - Chemical Squeeze
2003-02-18 Perforation Treatment Performed - Chemical Squeeze
2003-02-25 Perforation Treatment Performed - Chemical Squeeze
2003-03-01 Perforation Treatment Performed - Chemical Squeeze
2004-03-31 Well Fluid changed to Crude Bitumen
2004-03-31 Well Mode changed to Suspended
2004-05-10 Well Fluid changed to Crude Bitumen
2004-05-10 Well Mode changed to Pumping
2005-02-25 Well Log Performed
2005-02-26 Perforation Treatment Performed - Casing Patch (Over Perfs)
2005-02-27 Well Log Performed
2005-03-01 Perforation Treatment Performed - Jet Perforation
2005-03-01 Well Log Performed
2006-09-30 Well Fluid changed to Crude Bitumen
2006-09-30 Well Mode changed to Suspended
2009-03-01 Well Fluid changed to Crude Bitumen
2009-03-01 Well Mode changed to Pumping
2009-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-07 Plug Back Performed
2009-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-08 Plug Back Performed
2009-03-09 Perforation Treatment Performed - Jet Perforation
2010-05-09 Well Log Performed
2010-10-01 Well Fluid changed to Crude Bitumen
2010-10-01 Well Mode changed to Suspended
2017-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-07-24 Plug Back Performed
2017-07-24 Well Fluid changed to Crude Bitumen
2017-07-24 Well Mode changed to Abandoned Zone
2017-12-15 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-03-30 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-04-12 Perforation 484.00 487.50 26
2003-01-28 Chemical Squeeze 484.00 487.50 0
2003-01-28 Chemical Squeeze 507.00 511.00 0
2003-01-29 Chemical Squeeze 484.80 486.80 0
2003-01-29 Chemical Squeeze 484.00 487.50 0
2003-01-29 Chemical Squeeze 507.00 511.00 0
2003-01-31 Chemical Squeeze 484.00 487.50 0
2003-01-31 Chemical Squeeze 507.00 511.00 0
2003-02-04 Chemical Squeeze 507.00 511.00 0
2003-02-10 Chemical Squeeze 484.00 487.50 0
2003-02-10 Chemical Squeeze 507.00 511.00 0
2000-06-22 Perforation 507.00 511.00 26
2003-02-14 Chemical Squeeze 507.00 511.00 0
2003-02-15 Chemical Squeeze 507.00 511.00 0
2003-02-18 Chemical Squeeze 507.00 511.00 0
2003-02-25 Chemical Squeeze 507.00 511.00 0
2003-03-01 Chemical Squeeze 507.00 511.00 0
2005-02-26 Casing Patch 507.00 511.00 0
2005-03-01 Perforation 598.00 602.00 26
2009-03-07 Packing Device Capped w/Cement 511.00 580.50 0
2009-03-08 Packing Device Capped w/Cement 487.50 501.00 0
2009-03-09 Perforation 462.00 464.00 26
2002-04-16 Chemical Squeeze 484.80 486.80 0
2017-07-24 Packing Device Capped w/Cement 473.00 482.00 0
2017-07-24 Packing Device Capped w/Cement 443.00 452.00 0
2002-04-16 Chemical Squeeze 484.00 487.50 0
2002-04-16 Chemical Squeeze 507.00 511.00 0
2002-04-23 Chemical Squeeze 484.80 486.80 0
2002-04-23 Chemical Squeeze 484.00 487.50 0
2002-04-23 Chemical Squeeze 507.00 511.00 0
2003-01-28 Chemical Squeeze 484.80 486.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 3118 0.0 0.0 0.0
2002 1343 0.0 0.0 0.0
2003 842 0.0 0.0 0.0
2004 4910 0.0 0.0 0.0
2005 55 0.0 0.0 0.0
2009 6203 0.0 0.0 0.0
2010 4719 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-07-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References