X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554041910022

Well Details

Well ID: 0554041910022
Loading map...
Location: 02/10-19-055-04W4/2
Location Alias: 02/10-19-55-04 W4M
Location Alias 2: 02/10-19-055-04 W4/02
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 04
Section: 19
County/Municipality: County of Vermilion River
Well Name: PVR 10C LINDBERGH 10-19-55-4
Operator Name: Canadian Natural Resources Limited
License Number: 0230273
License Date: 1999-12-11
License Status: Abandoned
Spud Date: 2000-01-06
Final Drill Date: 2000-01-09
Well Total Depth: 670.00 m
Surface Hole Latitude: 53.769634
Surface Hole Longitude: -110.581280

For data sources see[1][2]

Well History

Date Event
1999-12-11 Obtained License
2000-01-06 Direction Drilling Operation Performed - Deviate
2000-01-07 Surface Casing Operation Performed
2000-01-09 Finished Drilling
2000-01-09 Well Log Performed
2000-01-09 Well Mode changed to Drilled and Cased
2000-01-10 Rig Released
2000-01-18 Well Log Performed
2000-02-09 Perforation Treatment Performed - Jet Perforation
2000-02-09 Production Casing Operation Performed
2000-02-09 Well Log Performed
2002-04-06 Perforation Treatment Performed - Chemical Squeeze
2003-02-14 Perforation Treatment Performed - Chemical Squeeze
2003-02-19 Perforation Treatment Performed - Chemical Squeeze
2003-02-21 Perforation Treatment Performed - Chemical Squeeze
2007-09-28 Well Began Production
2007-09-28 Well Fluid changed to Crude Bitumen
2007-09-28 Well Mode changed to Pumping
2007-09-30 Perforation Treatment Performed - Cement Plug
2007-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-01 Perforation Treatment Performed - Jet Perforation
2007-10-01 Plug Back Performed
2008-06-30 Well Fluid changed to Crude Bitumen
2008-06-30 Well Mode changed to Suspended
2008-12-01 Well Fluid changed to Crude Bitumen
2008-12-01 Well Mode changed to Pumping
2009-06-30 Well Fluid changed to Crude Bitumen
2009-06-30 Well Mode changed to Suspended
2017-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-06-07 Plug Back Performed
2017-06-07 Well Fluid changed to Crude Bitumen
2017-06-07 Well Mode changed to Abandoned Zone
2017-12-15 Well Abandoned
2017-12-15 Well Fluid changed to Crude Bitumen
2017-12-15 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-01-06 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-09 Perforation 552.00 558.00 26
2003-02-19 Chemical Squeeze 552.00 558.00 0
2003-02-19 Chemical Squeeze 560.00 563.00 0
2003-02-19 Chemical Squeeze 565.00 568.00 0
2003-02-21 Chemical Squeeze 552.00 558.00 0
2003-02-21 Chemical Squeeze 565.00 568.00 0
2003-02-21 Chemical Squeeze 560.00 563.00 0
2007-09-30 Cement Plug 635.00 670.00 0
2007-10-01 Packing Device Capped w/Cement 528.00 540.00 0
2007-10-01 Perforation 507.30 508.30 26
2007-10-01 Perforation 511.00 512.50 26
2000-02-09 Perforation 560.00 563.00 26
2017-06-07 Packing Device Capped w/Cement 487.00 497.00 0
2000-02-09 Perforation 565.00 568.00 26
2002-04-06 Chemical Squeeze 552.00 558.00 0
2002-04-06 Chemical Squeeze 560.00 563.00 0
2002-04-06 Chemical Squeeze 565.00 568.00 0
2003-02-14 Chemical Squeeze 552.00 558.00 0
2003-02-14 Chemical Squeeze 560.00 563.00 0
2003-02-14 Chemical Squeeze 565.00 568.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 921 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-06-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References