X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554033511020

Well Details

Well ID: 0554033511020
Loading map...
Location: 02/11-35-055-03W4/0
Location Alias: 02/11-35-55-03 W4M
Location Alias 2: 02/11-35-055-03 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 03
Section: 35
County/Municipality: County of Vermilion River
Well Name: PVR 11D FROG LAKE 11-35-55-3
Operator Name: Canadian Natural Resources Limited
License Number: 0185728
License Date: 1996-02-13
License Status: Suspension
Spud Date: 1996-03-31
Final Drill Date: 1996-04-01
Well Total Depth: 582.00 m
Surface Hole Latitude: 53.799019
Surface Hole Longitude: -110.343966

For data sources see[1][2]

Well History

Date Event
1996-02-13 Obtained License
1996-03-31 Direction Drilling Operation Performed - Deviate
1996-03-31 Surface Casing Operation Performed
1996-04-01 Finished Drilling
1996-04-01 Production Casing Operation Performed
1996-04-01 Well Log Performed
1996-04-01 Well Mode changed to Drilled and Cased
1996-04-02 Rig Released
1996-04-09 Well Log Performed
1996-06-16 Well Log Performed
1996-06-17 Perforation Treatment Performed - Jet Perforation
1996-07-06 Well Began Production
1996-07-06 Well Fluid changed to Crude Bitumen
1996-07-06 Well Mode changed to Pumping
1997-09-15 Perforation Treatment Performed - Jet Perforation
1997-09-15 Well Log Performed
1999-03-22 Well Fluid changed to Crude Bitumen
1999-03-22 Well Mode changed to Suspended
2002-09-25 Perforation Treatment Performed - Chemical Squeeze
2002-09-28 Well Fluid changed to Crude Bitumen
2002-09-28 Well Mode changed to Pumping
2003-10-15 Well Log Performed
2004-03-31 Well Fluid changed to Crude Bitumen
2004-03-31 Well Mode changed to Suspended
2004-04-01 Well Fluid changed to Crude Bitumen
2004-04-01 Well Mode changed to Pumping
2005-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-06-26 Perforation Treatment Performed - Jet Perforation
2007-04-16 Perforation Treatment Performed - Jet Perforation
2011-03-31 Well Fluid changed to Crude Bitumen
2011-03-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-03-31 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-17 Perforation 515.00 518.00 30
1997-09-15 Perforation 515.00 519.50 30
2002-09-25 Chemical Squeeze 515.00 519.50 0
2005-06-25 Packing Device Capped w/Cement 518.90 562.60 0
2005-06-26 Perforation 502.50 505.00 20
2007-04-16 Perforation 508.00 510.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2834 0.0 0.0 0.0
1997 8284 0.0 0.0 0.0
1998 2778 0.0 0.0 0.0
2002 2277 0.0 0.0 0.0
2003 3673 0.0 0.0 0.0
2004 3817 0.0 0.0 0.0
2005 4246 0.0 0.0 0.0
2006 528 0.0 0.0 0.0
2007 6094 0.0 0.0 0.0
2008 8164 0.0 0.0 0.0
2009 7852 0.0 0.0 0.0
2010 2038 0.0 0.0 0.0

For data sources see[6]

References