X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554033509000

Well Details

Well ID: 0554033509000
Loading map...
Location: 00/09-35-055-03W4/0
Location Alias: 00/09-35-55-03 W4M
Location Alias 2: 00/09-35-055-03 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 03
Section: 35
County/Municipality: County of Vermilion River
Well Name: PVR 9B LINDBERGH 9-35-55-3
Operator Name: Canadian Natural Resources Limited
License Number: 0187383
License Date: 1996-04-24
License Status: Abandoned
Spud Date: 1996-06-09
Final Drill Date: 1996-06-10
Well Total Depth: 620.00 m
Surface Hole Latitude: 53.797923
Surface Hole Longitude: -110.333996

For data sources see[1][2]

Well History

Date Event
1996-04-24 Obtained License
1996-06-09 Direction Drilling Operation Performed - Deviate
1996-06-09 Surface Casing Operation Performed
1996-06-10 Finished Drilling
1996-06-10 Well Log Performed
1996-06-10 Well Mode changed to Drilled and Cased
1996-06-11 Production Casing Operation Performed
1996-06-11 Rig Released
1996-06-17 Well Log Performed
1996-06-29 Well Log Performed
1996-06-30 Perforation Treatment Performed - Jet Perforation
1996-07-03 Well Began Production
1996-07-03 Well Fluid changed to Crude Bitumen
1996-07-03 Well Mode changed to Pumping
1996-12-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-31 Plug Back Performed
1996-12-31 Well Fluid changed to Crude Bitumen
1996-12-31 Well Mode changed to Abandoned Zone
1997-01-02 Perforation Treatment Performed - Jet Perforation
1997-01-02 Well Log Performed
2007-06-06 Perforation Treatment Performed - Jet Perforation
2011-11-04 Perforation Treatment Performed - Cement Plug
2011-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-07 Plug Back Performed
2011-11-10 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-06-09 85.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-30 Perforation 607.00 610.00 30
1996-12-31 Packing Device Capped w/Cement 596.00 608.00 0
1997-01-02 Perforation 530.50 533.50 30
2007-06-06 Perforation 519.00 522.00 20
2011-11-04 Cement Plug 533.00 596.00 0
2011-11-07 Packing Device Capped w/Cement 445.00 510.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 961 0.0 0.0 0.0
1997 809 0.0 0.0 0.0

For data sources see[6]

References