X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0554023407000

Well Details

Well ID: 0554023407000
Loading map...
Location: 00/07-34-055-02W4/0
Location Alias: 00/07-34-55-02 W4M
Location Alias 2: 00/07-34-055-02 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 02
Section: 34
County/Municipality: County of Vermilion River
Well Name: POCO JOHN LAKE 7-34-55-2
Operator Name: Ipc Canada Ltd.
License Number: 0179260
License Date: 1995-07-13
License Status: Abandoned
Spud Date: 1995-07-31
Final Drill Date: 1995-08-03
Well Total Depth: 616.00 m
Surface Hole Latitude: 53.793579
Surface Hole Longitude: -110.211158

For data sources see[1][2]

Well History

Date Event
1995-07-13 Obtained License
1995-07-29 Well Log Performed
1995-08-01 Surface Casing Operation Performed
1995-08-03 Finished Drilling
1995-08-03 Well Log Performed
1995-08-03 Well Mode changed to Drilled and Cased
1995-08-04 Production Casing Operation Performed
1995-08-04 Rig Released
1995-09-01 Well Log Performed
1995-09-04 Perforation Treatment Performed - Jet Perforation
1995-09-04 Well Log Performed
1995-09-09 Well Log Performed
1995-09-10 Well Began Production
1995-09-10 Well Fluid changed to Crude Bitumen
1995-09-10 Well Mode changed to Pumping
1999-02-01 Well Fluid changed to Crude Bitumen
1999-02-01 Well Mode changed to Suspended
1999-08-13 Well Fluid changed to Crude Bitumen
1999-08-13 Well Mode changed to Pumping
2001-09-01 Well Fluid changed to Crude Bitumen
2001-09-01 Well Mode changed to Suspended
2002-07-27 Well Fluid changed to Crude Bitumen
2002-07-27 Well Mode changed to Pumping
2002-08-01 Well Fluid changed to Crude Bitumen
2002-08-01 Well Mode changed to Pumping
2008-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-08 Perforation Treatment Performed - Jet Perforation
2008-08-08 Plug Back Performed
2011-01-01 Well Fluid changed to Crude Bitumen
2011-01-01 Well Mode changed to Suspended
2011-05-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-05-10 Plug Back Performed
2011-05-10 Well Fluid changed to Crude Bitumen
2011-05-10 Well Mode changed to Abandoned Zone
2011-05-17 Well Abandoned
2011-05-17 Well Fluid changed to Crude Bitumen
2011-05-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-04 Perforation 508.00 511.00 2
2008-08-08 Packing Device Capped w/Cement 498.80 502.40 0
2008-08-08 Perforation 475.00 476.00 26
2011-05-10 Packing Device Capped w/Cement 462.00 473.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 2444 0.0 0.0 0.0
1996 7555 0.0 0.0 0.0
1997 1246 0.0 0.0 0.0
1999 10 0.0 0.0 0.0
2000 3955 0.0 0.0 0.0
2001 142 0.0 0.0 0.0
2002 2570 0.0 0.0 0.0
2003 5385 0.0 0.0 0.0
2004 5855 0.0 0.0 0.0
2005 2928 0.0 0.0 0.0
2008 4595 0.0 0.0 0.0

For data sources see[5]

References