X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0545260107003

Well Details

Well ID: 0545260107003
Loading map...
Location: 00/07-01-054-26W5/3
Location Alias: 00/07-01-54-26 W5M
Location Alias 2: 00/07-01-054-26 W5/03
Country: Canada
Province: Alberta
Township: 054
Meridian: 5
Range: 26
Section: 01
County/Municipality: Yellowhead County
Well Name: HUNT MARSH 7-1-54-26
Operator Name: Tourmaline Oil Corp.
License Number: 0202440
License Date: 1997-06-11
License Status: Suspension
Spud Date: 1997-06-18
Final Drill Date: 1997-07-24
Well Total Depth: 2270.00 m
Surface Hole Latitude: 53.632467
Surface Hole Longitude: -117.693479

For data sources see[1][2]

Well History

Date Event
1997-06-11 Obtained License
1997-06-22 Surface Casing Operation Performed
1997-07-04 Well Log Performed
1997-07-24 Finished Drilling
1997-07-24 Well Log Performed
1997-07-30 Production Casing Operation Performed
1997-07-31 Rig Released
1997-08-08 Well Log Performed
1997-08-09 Perforation Treatment Performed - Jet Perforation
1997-08-09 Well Log Performed
1997-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-16 Perforation Treatment Performed - Fractured
1997-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-20 Plug Back Performed
1997-08-20 Well Log Performed
1997-08-21 Well Log Performed
1997-08-22 Perforation Treatment Performed - Jet Perforation
1997-08-23 Perforation Treatment Performed - Fractured
1997-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-27 Perforation Treatment Performed - Jet Perforation
1997-08-27 Plug Back Performed
1997-08-27 Well Log Performed
1997-08-27 Well Mode changed to Drilled and Cased
1997-08-28 Perforation Treatment Performed - Fractured
1997-09-26 Perforation Treatment Performed - Jet Perforation
1997-09-26 Well Log Performed
1997-09-28 Perforation Treatment Performed - Fractured
1997-10-01 Perforation Treatment Performed - Chemical Squeeze
1997-10-07 Perforation Treatment Performed - Chemical Squeeze
2018-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-09 Perforation 2237.00 2239.00 20
1997-08-28 Fracture 2117.50 2126.00 0
1997-09-26 Perforation 2112.00 2117.50 20
1997-09-28 Fracture 2112.00 2126.00 0
1997-10-01 Chemical Squeeze 2112.00 2126.00 0
1997-10-07 Chemical Squeeze 2112.00 2126.00 0
2018-08-10 Packing Device Capped w/Cement 2097.00 2105.00 0
1997-08-09 Perforation 2243.00 2246.30 20
1997-08-15 Acid Treatment 2237.00 2246.30 0
1997-08-16 Fracture 2237.00 2246.30 0
1997-08-20 Packing Device Capped w/Cement 2224.00 2232.00 0
1997-08-22 Perforation 2191.00 2194.00 20
1997-08-23 Fracture 2191.00 2194.00 0
1997-08-27 Packing Device Capped w/Cement 2178.00 2186.00 0
1997-08-27 Perforation 2117.50 2126.00 20

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-10 No Incident Encountered 0.00 0.00

For data sources see[5]

References